Objective

Part 1: Secondary side.
Similar to the water chemistry improvement performed on Kalinin NPP, which at that time was the pilot plant for water chemistry improvement, it was decided to install this also on Balakovo NPP Unit 1.
On-line analysis equipment similar to the equipment supplied under TACIS 92 for NPP Kalinin was installed on the secondary side where a condenser cleaning plant was also about to be installed. After introduction of these measures and the installation of the condenser tube cleaning plant (financed from TACIS 92) Balakovo Unit 1 became the first NPP where the water chemistry problem is improved significantly on the secondary side.

Part 2: Primary side.
Assessment of the existing water chemistry control and proposals for improvement.

Result

The equipment was installed on both sides, 1st and 2nd loop, which significantly contributed to the reliability of the Steam Generators.


General Information

Title: 
Balakovo NPP: Improvement of water chemistry on primary and secondary side at Unit 1
Programme: 
TACIS
Amount: 
€ 455.315,75
Budget year: 
1994
Countries: 
Russia
Nature: 
Supply
NPP: 
Balakovo
Duration (months): 
10
Contracting authority: 
Rosenergoatom
Contractors: 
Balduf
Status: 
Closed
Old reference: 
ITALTREND-1355 (contract PA)
Project reference: 
R1.02/94A
Decision number: 
multi annual
Method of procurement: 
Special Fund (Procurement Agent)
IAEA: 
I
Procurement Agent contract: 
ITALTREND 94-1355
Procurement Agent reference: 
wo7 NSP-003-BAL-002
Procurement Agent provisional acceptance: 
11/11/1997
Procurement Agent Final acceptance: 
11/11/1999
Signature date: 
23/12/1996
Effective contract date: 
23/12/1996
Contract end date: 
11/11/1997
Closure date: 
11/11/1999