Crisis management and safety panels
Crisis management and safety panels
Description
Objective
The objective of the project is to analyse the safety improvement by increasing the quality and availability of the information provided to plant operators and engineers, as well as to other decision-makers in order to finally make the right decisions in the shortest time.
The objective was divided into the following tasks:
- Task 1: Description and evaluation of the crisis organization in Russia;
- Task 2: Assessment of the communication means for Russian NPP;
- Task 3.A: Description and evaluation of local crisis management on Russian NPP;
- Task 3.B, 3.C: Drawing up a Safety Panel general specification;
- Task 3.D: Assessment of Kalinin NPP Safety Parameter Display System (SPDS) data acquisition;
- Task 3.E: Setting up a Mock-up specification.
Presentation of the Safety Panels to the License Organization
Result
The tasks as given above have been executed successfully. With this result the basis has been laid to proceed with further projects:
- R2.03/93 - SPDS in control room;
- R1.03/95D - Replacement of information system, SPDS supply and implementation in KALININ NPP (Phase 3);
- R2.04/95 - Overall operational information feedback system;
- R2.01/95 - Supply of a SPDS to Rosenergoatom crisis centre and technical support for implementation.
General Information
Title:
Crisis management and safety panels
Programme:
TACIS
Amount:
€ 429.783,23
Budget year:
1991
Countries:
Russia
Nature:
Services
Types of activities:
Design safety
Sector:
DS - Design safety (incl. Off-Site Emergency Preparedness)
Duration (months):
13
Contracting authority:
European Commision
Partner (Beneficiary):
Rosenergoatom
Contractors:
ATOS ORIGIN BELGIUM SA
Status:
Closed
CRIS number:
22136
Old reference:
93-0491
Project reference:
R4.2/91
Decision number:
TACIS/1991/000-323
Method of procurement:
Restricted Call for Tender
IAEA:
II
Signature date:
07/09/1993
Effective contract date:
07/09/1993
Contract end date:
07/10/1994
Closure date:
07/10/1994