Description

This contract id for the design, supply, installation, etc including , testing and commissioning, training and, spare parts and/or consumables and after-sales services of:
EQUIPMENT:
2 X Server, Type 1 RDBMS (rack mount)
IX Server, Type 2 Application server (rack mount)
IX Redundant Array of Independent Disks (RAID)
IX Long-term data storage array
IX Uninterruptable power supply for servers
IX Rack mount case
�� IX Access control equipment (Firewalls)
1 X Router
IX Access point WiFi (WLan)
30 X workstations (data)
4 X workstations (graphics)
2 X Laptops
1 X Multimedia projector
1 X Printer, Type 1
6 X Printer, Type 2
1 X Plotter
1 X Scanner, Type 1
IX Scanner, Type 2
IX Copy machine Type 1
1 X Copy machine Type 2
IX Digital photocamera
with associated documentation, equipment certification, training and spare parts and/or consumables
SOFTWARE
Decommissioning Information Support System
Operational system for 3 servers
Operational system for 36 workstations and laptops
Relational Database Management System for 2 database servers
Application Management System for 1 application server
hitemet application development system
Office application software for 36 workstations and laptops
Antivirus protection software (type 1) for 3 servers
Antivirus protection software (type 2) for 36 workstations and laptops
Computer-Aided design software (type 1) for 4 graphic workstations
Computer-Aided design software (type 2) for 4 graphic workstations
OCR software for 4 graphic workstations
Associated documentation and training
a
t Chernobyl Nuclear Power Plant (Ukraine).


General Information

Title: 
Decommissioning Information Support System for the Chernobyl NPP
Programme: 
TACIS
Amount: 
€ 1.482.985,42
Budget year: 
2006
Meta geographical zone: 
Chernobyl
Countries: 
Ukraine
Nature: 
Services
Types of activities: 
Mitigation of Chernobyl accident
Sector: 
WDS - Waste, Decommissioning and Safeguards
NPP: 
Chernobyl
Installation types: 
RBMK
Duration (months): 
45
Contracting authority: 
Chernobyl NPP
Contractors: 
EWN (Energiewerke Nord)
Status: 
Closed
CRIS number: 
132893
Project reference: 
U4.04/06
Decision number: 
TACIS/2006/018-041
Method of procurement: 
Restricted Call for Tender
Signature date: 
22/12/2008
Effective contract date: 
26/05/2009
Contract end date: 
26/02/2013
Closure date: 
04/09/2014