Development of Safety and Regulatory requirements for RWM and licensing support for RWM facilities

 
Development of Safety and Regulatory requirements for RWM and licensing support for RWM facilities

Description

This project consisted of the transfer of European Regulatory methodology and practices to the Nuclear Safety Authority (NRSS) of Georgia. The project was implemented in 2009 and 2010 and continues the work carried out in project GE/RA/01.

The technical tasks of the project were:

Task 1: This task provided support for the review of the current regulatory framework in the field of radioactive waste management and storage. The draft laws “on Nuclear and Radiation Safety” and “On Radioactive Waste and Waste Management facilities” were finalized, using experience from the EU.

Task 2: This task was subdivided in two sub-tasks: establishing the regulatory requirements for Radwaste storage facility (sub-task 2.1) and for Radwaste disposal facility (sub-task 2.2.). As a result of those sub-tasks, the draft regulations “General requirements for the content of a Safety Analysis Report (SAR) of a storage facility” and “general requirements for the content of a SAR of a near-surface disposal facility” were improved, based on EU experience.

Task 3: This task consisted of support for the safety evaluation of the RadWaste storage facility. As the SAR of the industrial facility in Georgia was not available as planned, the safety evaluation has been carried out with the SAR of another existing storage facility in Europe, in order to allow the transfer of knowledge to NRSS.

Task 4: This task aimed to provide support to NRSS for the review of the country strategy for Radwaste management and it resulted in a strategy paper for Radwaste management prepared by NRSS and including the recommendations of the EU experts.

Task 5: This task consisted of assisting NRSS for the definition of future cooperation programmes.

Task 6: This task aimed to allow limited participation of NRSS experts in international conferences. In this framework, one Georgian expert attended training courses about institutional capacity building at the University of Palermo and another one participated in the Eurosafe forum in Cologne.


General Information

Title: 
Development of Safety and Regulatory requirements for RWM and licensing support for RWM facilities
Programme: 
TACIS
Amount: 
€ 456.559,39
Budget year: 
2006
Countries: 
Georgia
Nature: 
Services
Types of activities: 
Regulatory Authorities
Duration (months): 
24
Contracting authority: 
European Commission
Contractors: 
Riskaudit
Status: 
Closed
CRIS number: 
132897
Project reference: 
G3.01/06
Decision number: 
TACIS/2006/018-041
Method of procurement: 
Negotiated Procedure
Signature date: 
17/11/2008
Effective contract date: 
05/12/2008
Contract end date: 
06/12/2010
Closure date: 
14/10/2014