Navigation path

Kalinin NPP: Instrumentation for Bitumization plant

 
Kalinin NPP: Instrumentation for Bitumization plant

Description

Objective
The objective of this project was to upgrade the bitumization plant for radwaste. (See also Project R1.03/92D.)
It was decided to replace the existing flow meters for bitumen and waste, and to install measuring devices for hazardous components in the off-gas in order to improve the safety of the bitumization process, as well as other additional devices.
Result
The equipment procured for improvement for the existing bitumization facility was the following:

  1. In-line flow meter for liquid bitumen.
  2. In-line flow meter for liquid radioactive waste concentrates.
  3. In-line flow meter for liquid evaporator distillate.
  4. Measuring apparatus for hydrogen and methane gases in the ventilation off-gas line.
  5. Level detection device for bitumen.

The equipment has been successfully installed.


General Information

Title: 
Kalinin NPP: Instrumentation for Bitumization plant
Programme: 
TACIS
Amount: 
€ 5.663,00
Budget year: 
1992
Countries: 
Russia
Nature: 
Supply
Types of activities: 
Equipment Supply
NPP: 
Kalinin
Duration (months): 
11
Contracting authority: 
Special Fund (EC)
Partner (Beneficiary): 
Rosenergoatom
Contractors: 
Hydro Chem
Status: 
Closed
Old reference: 
CA 94-0046 & 94-1165 (PA)
Project reference: 
R1.03/92F
Decision number: 
multi annual
Method of procurement: 
Special Fund (Procurement Agent)
Procurement Agent contract: 
Crown Agents 94-0046&94-1165
Procurement Agent reference: 
C4AA 3/35005/001
Signature date: 
02/05/1994
Effective contract date: 
02/05/1994
Contract end date: 
17/04/1995
Closure date: 
17/04/1995