Kalinin NPP: Safety Parameter Display System supply and implementation (R1.03/96E and R2.01/95 are included)
Kalinin NPP: Safety Parameter Display System supply and implementation (R1.03/96E and R2.01/95 are included)
Description
Objective
As continuation of TACIS projects R4.2/91 and TACIS project R2.03/93, the final stage of this project is the development of an operational data acquisition and retrieval system for safety parameters and its implementation and integration into a full scope simulator for validation.
Result
Project R1.03/95D has been merged with R2.01/95 and the associated funds were transferred accordingly.
The overall contracted supply consists of a Computerised Information/Safety Panel (CI/SP) system and associated provision for Crisis Centres.
It comprises the design, development, validation testing, delivery, installation, putting into operation, training and maintenance of a Computerised Information/Safety Panel (CI/SP) system intended for Unit 2 including:
• All CI/SP system equipment and software associated with existing level 1 and level 2;
• Crisis Centres configuration system;
• Source code of all CI/SP application software;
• CI/SP system database preparation;
• All CI/SP associated cables and connecting devices, cabling and connection work;
• Electrical power protection/distribution.