Kalinin NPP: Upgrading of 6kV power supply system

 
Kalinin NPP: Upgrading of 6kV power supply system

Description

Objective
A general assessment was to be performed on how to improve the medium voltage supply at Kalinin. The assessment should cover medium voltage distribution associated with automation, supervision and cabling.
Deliverables of the assessment:
Characteristics and nature of the power supply to be upgraded according to NPP requirements and technical aspects;
Specification of a possible next stage of upgrading, including budget figures;
Supply and installation of equipment.
 
Result
The objectives as defined were achieved. The equipment has been installed at Kalinin NPP in the outage June-September 1999.


General Information

Title: 
Kalinin NPP: Upgrading of 6kV power supply system
Programme: 
TACIS
Amount: 
€ 114.239,00
Budget year: 
1994
Countries: 
Russia
Nature: 
Supply
Types of activities: 
Equipment Supply
NPP: 
Kalinin
Duration (months): 
37
Contracting authority: 
Rosenergoatom
Partner (Beneficiary): 
Rosenergoatom
Contractors: 
Schneider Electric
Status: 
Closed
Old reference: 
ITALTREND-1355 (contract PA)
Project reference: 
R1.03/94C
Decision number: 
multi annual
Method of procurement: 
Special Fund (Procurement Agent)
IAEA: 
II
Procurement Agent contract: 
ITALTREND 94-1355
Procurement Agent reference: 
wo16 NSP-014-KAL-004
Procurement Agent provisional acceptance: 
15/01/2001
Procurement Agent Final acceptance: 
17/01/2002
Signature date: 
04/12/1997
Effective contract date: 
04/12/1997
Contract end date: 
15/01/2001
Closure date: 
17/01/2002