Navigation path

Kola NPP: On Site Assistance (93 & 94)

 
Kola NPP: On Site Assistance (93 & 94)

Description

Objective R1.01/93

This On-Site-Assistance, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases the OSA was performed by an EU utility, working with a team of Western and Russian experts.

General purpose of the OSA:

  • Definition of safety deficits;
  • Proposal for remediation with or without further financial EC support;
  • Definition of project proposals for EC to seek financial support for the selected project(s);
  • Preparation of “Technical Specifications” (TS) for equipment supply projects, when a project has been adopted by EC and Minatom;
  • Preparation of “Technical Terms of Reference” (TOR) for service projects, if considered necessary;
  • Assistance to EC and Beneficiary in the procurement process to purchase the equipment;
  • Assistance in the implementation / installation of procured equipment. The Utility contracted by EC for this OSA was KLE (NPP Emsland, Germany).

Result

In particular in the framework of this OSA project, the Utility supported the preparation of the technical specification of the following projects:

R1.01/94A - Modernisation of the Reactor Control System on Unit 3&4
R1.01/94B - Reliable power supply system for the control room
R1.01/94C - Replacement of SG Safety valves on two Units
R1.01/94D - Leak detection system primary to secondary Loop
R1.01/94E - Living PSA
R1.01/94F - Supply of spare parts
R1.01/94G - Liquid Radwaste removal from storage tanks
R1.01/94H - Burners for incineration facility

Objective R1.01/94

According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 93 with the same Western and Eastern Utility and NPPs. Similar to the procedure in TACIS 92 a joint Western/Eastern working team was to be set up to continue the work started in TACIS 92. In this case KKW Emsland was the Consultant, contracted by the EC to provide operational safety assistance to Kola NPP.

Result

The projects, defined under the Tacis budget 1993/4 have been supported by the Western Utility in the following aspects:

  • Setting up of a Technical Specification (TS);
  • Agreement with EC and Beneficiary on the TS;
  • Assistance in the procurement process;
  • Assistance in custom clearance;
  • Assistance in installation of the equipment.

Further general assistance has been given by the Western Utility in upgrading safety culture on the NPP.


General Information

Title: 
Kola NPP: On Site Assistance (93 & 94)
Programme: 
TACIS
Amount: 
€ 1.940.228,83
Budget year: 
1995
Countries: 
Russia
Nature: 
Services
Types of activities: 
On Site Assistance
NPP: 
Kola
Duration (months): 
23
Contracting authority: 
European Commission
Partner (Beneficiary): 
Rosenergoatom
Contractors: 
KLE (Kernkraftwerke Lippe-Ems)
Status: 
Closed
CRIS number: 
23341
Old reference: 
95-1211
Project reference: 
R1.01/93 & R1.01/94
Decision number: 
TACIS/1995/000-408
Method of procurement: 
Direct Agreement
Signature date: 
14/09/1995
Effective contract date: 
14/09/1995
Contract end date: 
14/08/1997
Closure date: 
14/08/1997