This project includes:
- Development of a special-items management technology and a waste-arising management technology. This includes retrieval, transfer and cutting of special items, and removal of graphite rings and graphite sleeves (hereinafter referred to as graphite) from reactor channels to be treated by the LLWCF.
- Designing the Long-Length Waste Cutting Facility (LLWCF) for ChNPP Unit 2 so that the LLWCF could also be moved to and deployed at ChNPP Units 1 and 3;
- Manufacturing, Testing, Delivery, Certification and Metrological Qualification of LLWCF equipment;
- Construction and Installation Work;
- LLWCF Installation, Set-up, Testing and Commissioning at ChNPP Unit 2;
- Spare-Parts Supply and Maintenance during Warranty Period;
- Development and Submission of Project Design Documentation;
-Training of Operating Personnel.