NPP Kozloduy 1-4, Six month WANO Programme. Item RLT: Rest Lifetime of the plant

 
NPP Kozloduy 1-4, Six month WANO Programme. Item RLT: Rest Lifetime of the plant

Description

Beneficiary Organisation Details

Kozloduy NPP
http://www.kznpp.org

Project Aims

  • To evaluate the remaining lifetime of components and systems on basis of a preliminary engineering judgment;
  • To define preventive actions on components and systems;
  • To identify components and systems which should be replaced or backfitted from the point of view of plant life.

The work performed by the Consortium was focused on unit No.2 of NPP Kozloduy.

Project Results

  • On basis of available documentation and information, an assessment of remaining life has been made for all selected components;
  • At this stage of the work, this assessment was based more or less on a week point analysis and an engineering judgment of the actual state of the components, considering possible ageing mechanisms. It should be pointed out, that during this phase of the work program, most emphasis was put on the pressure retaining parts rather than on functional parts of the components;
  • The results of the evaluation can only be transposed to the units 1, 3 and 4 at NPP Kozloduy with supplementary specific analysis.

Further Project Results

Further information on the project results could be sought from the beneficiary organisations.


General Information

Title: 
NPP Kozloduy 1-4, Six month WANO Programme. Item RLT: Rest Lifetime of the plant
Programme: 
PHARE
Budget year: 
1991
Countries: 
Bulgaria
Types of activities: 
Design safety
NPP: 
Kozloduy
Installation types: 
VVER 440-230
Duration (months): 
282
Contractors: 
Siemens
Sub-contractors: 
Energoprojekt, Ltd
Status: 
Completed
Old reference: 
PH/91(RLT)
Effective contract date: 
01/01/1992
Closure date: 
01/07/1992