Physical protection improvement including Russian equipment. (Phase 2)
Physical protection improvement including Russian equipment. (Phase 2)
Description
Objective
The present project was to produce the specific design of the physical protection system (PPS) on Kola, Novovoronezh, Kalinin, Kursk and Beloyarsk NPPs based on the general concept already performed.
The project was subdivided into the following tasks:
1. Management of the project; QA plan.
2. The set-up of the data packages (for NPPs concerned). Several missions are performed along the project.
3. Study of PPS related to a specific NPP. The study includes the validation of functional analyses issued from the previous definition studies from SNPP and BNPP, the basic design and the technical specifications.
4.The contractor will supply detailed cost estimates for each PPS concerning on-site systems implementation.
Those figures must be detailed according to three scenarios of implementation:
- Priority urgency no.1 relevant to minimum required security level;
- Medium level implementation of systems;
- Optimum implementation of systems.
Result
The project’s contract expired on 1.12.1998 without achieving the objective.
General Information
Title:
Physical protection improvement including Russian equipment. (Phase 2)
Programme:
TACIS
Amount:
€ 283.639,04
Budget year:
1995
Countries:
Russia
Nature:
Services
Types of activities:
On Site Assistance
Duration (months):
21
Contracting authority:
European Commission
Contractors:
Belgatom
Status:
Closed
CRIS number:
24482
Old reference:
96-5627
Project reference:
R1.09/95
Decision number:
TACIS/1995/000-408
Method of procurement:
Direct Agreement
Signature date:
01/03/1997
Effective contract date:
01/03/1997
Contract end date:
01/12/1998
Closure date:
01/12/1998