Preparation of an Industrial Fatigue Diagnostic System. (Continuation of 3.4/91).
Preparation of an Industrial Fatigue Diagnostic System. (Continuation of 3.4/91).
Description
Objective
The objective was to deliver the following items:
-
Hardware, Software and Test Environment for fatigue monitoring system:
- Evaluation computer;
- CPU Pentium 3 or 4, minimum 800 MHz clock rate;
- 256 Mbytes RAM;
- 10 Gbytes hard disc;
- MOD, Floppy disc and CD or DVD;
- Communication interface ISDN and analogue modem LAN;
- Serial RS232 lines: 1 free RS232 serial interface for receiving technological data from the plant computer.
-
Peripheral devices:
- Printer (B/W, minimum 9 p/min, A4) Keyboard;
- Mouse;
- High resolution colour display (better then 1024*768).
-
Operating System:
- Microsoft Windows Operating System.
-
Communication SW:
- PC Anywhere or similar.
-
Application SW:
- Temperature measurement and evaluating software.
-
DAU:
- 18 channel data acquisition unit with thermocouple inputs with integrated temperature compensation.
-
20 Thermo-couples:
- Material of cover: 1.4541;
- Thermocouple: NCr-Ni (Type K);
- Cover diameter: 1 mm;
- Cover wall thickness: 0.16 mm;
- Diameter of NiCr-Ni wire: 0.18 - 0.20 mm;
- Resistance:approximately 37.5 W/m;
- Measuring tip: welded with cover;
- Thermal stress: acc. to DIN IEC 584 part 1;
- Max. deviation: acc. to DIN IEC 584 part 2;
- Range of use: Type K;
- 1.5 or 0.004 [t];
- -40C to 2000C.
-
Point welding device:
- Point welding device for welding of the sensitive thermocouples at the measurement section;
- 230V AC 10%;
- 50Hz 1%.
Result
The equipment according to the objective has been delivered in 2003 and has been installed during the outage of Kalinin NPP in summer 2004.
General Information
Title:
Preparation of an Industrial Fatigue Diagnostic System. (Continuation of 3.4/91).
Programme:
TACIS
Amount:
€ 784.100,00
Budget year:
1994
Countries:
Russia
Nature:
Supply
Types of activities:
Design safety
Sector:
DS - Design safety (incl. Off-Site Emergency Preparedness)
NPP:
Kalinin
Duration (months):
23
Contracting authority:
Rosenergoatom
Partner (Beneficiary):
Rosenergoatom
Contractors:
Framatome
Status:
Closed
Old reference:
ITALTREND-1355 (contract PA)
Project reference:
R2.11/94
Decision number:
multi annual
Method of procurement:
Special Fund (Procurement Agent)
Procurement Agent contract:
ITALTREND 94-1355
Procurement Agent reference:
wo43 NSP-050-REA-007
Procurement Agent provisional acceptance:
11/08/2004
Procurement Agent Final acceptance:
22/08/2005
Signature date:
09/09/2002
Effective contract date:
09/09/2002
Contract end date:
11/08/2004
Closure date:
22/08/2005