Probabilistic Safety Analysis
Probabilistic Safety Analysis
Description
Objective
The main objective of the project was the transfer of Western Probabilistic Safety Analysis (PSA) and External Events methodology and experience to the Russian Beneficiary. It concerned the level I of PSA. It enabled the Russian specialists to identify weak areas where improvements are needed, to assign priorities in a modification schedule and to verify the validity of the proposed modifications.
Result
Summary:
- Setting up Procedures and Guidelines for Development of a PSA-Level 1;
- Providing necessary Software and Hardware (see below) Assistance in Review of Reliability Data most appropriate to be used in the VVER 440/V 230 Plant PSA;
- Assist Russian Specialists and work together with them on Novovoronezh Unit 3 PSA;
- Assistance in performing analysis of external events (natural and man-made events, internal fires, flooding, missiles, pipe whip) for the same plant.
Supply of tools:
- 3 HP Vectra VL2 4/50 Model 210 80486 DX2-50 MHz, 4MB RAM, 210 MB IDE-Hard disk, 3,5” FDD, Incl. DOS 6.2, Windows 3.1;
- 3 HP Vectra VL2 4/50 Model 340 80486 DX 2-50 MHz, 8MB RAM, 340 MB Hard disk, 3,5” FDD, MS-DOS 6.2, Windows 3.1;
- 6 Monitors;
- 1 HP Laserjet IV plus printer;
- 1 CANON NP 1215 photocopier;
- License RISK Spectrum (5 copies);
- Support of the above mentioned RISK Spectrum Licenses;
- License of COMPBRNEA.
External event analysis:
- Fire analysis;
- Flooding analysis;
- Missile impact analysis;
- Pipe whip analysis;
- Natural and Man-Made Events Analysis;
- Interim/Final Report for the above analysis.
Internal event analysis:
- Identification of initiating events and success criteria;
- Collection of Reliability Data;
- Accident Sequence Development;
- System Analysis- Dependency Analysis;
- Human Reliability Analysis;
- Event Tree Quantification;
- Importance, sensitivity and uncertainty analysis;
- Interim/Final Probabilistic Safety Analysis Report.
General Information
Title:
Probabilistic Safety Analysis
Programme:
TACIS
Amount:
€ 703.693,03
Budget year:
1991
Countries:
Russia
Nature:
Services
Types of activities:
Probabilistic Safety Analysis
Sector:
DS - Design safety (incl. Off-Site Emergency Preparedness)
NPP:
Novovoronezh
Duration (months):
25
Contracting authority:
European Commission
Partner (Beneficiary):
Rosenergoatom
Contractors:
Empresarios Agrupados
Status:
Closed
CRIS number:
22127
Old reference:
93-0482
Project reference:
R1.4/91
Decision number:
TACIS/1991/000-323
Method of procurement:
Restricted Call for Tender
Signature date:
12/07/1993
Effective contract date:
12/07/1993
Contract end date:
12/08/1995
Closure date:
12/08/1995
Contract Documents: