PSA Level 1 on VVER 230 (Novovoronezh 3)

 
PSA Level 1 on VVER 230 (Novovoronezh 3)

Description

Objective

The present project is an extension of TACIS-91 project 1.4 Probabilistic Safety Analysis. Its main goal is the development of a full scale level 1 PSA for Novovoronezh NPP Unit 3 for internal initiating events with respect to all basic conditions during operation and measures to enhance safety provided by modernization program.

Level 1 PSA for Novovoronezh Unit 3 within project 1.4 of TACIS-91 has been performed for a limited list of initiating events at reactor operation at power using conservative assumptions to define success criteria and modelling of personnel erroneous actions.

It had to be taken into account that during development of Level 1 PSA for Novovoronezh Unit 3 within project 1.4 of TACIS-91 the measurements to enhance safety provided by modernization program which have been implementing were not considered.

The PSA Level 1 was also requested by the safety authority GAN as an integral part of the in-depth safety report to be prepared for Novovoronezh-3. The actual plant status end of 2000 had to be taken into account in the analysis. This has slightly changed the scope of tasks as per TOR.

Result

The objective as outlined above has been achieved successfully.


General Information

Title: 
PSA Level 1 on VVER 230 (Novovoronezh 3)
Programme: 
TACIS
Amount: 
€ 494.450,00
Budget year: 
1996
Countries: 
Russia
Nature: 
Services
Types of activities: 
Design safety
Sector: 
DS - Design safety (incl. Off-Site Emergency Preparedness)
Duration (months): 
24
Contracting authority: 
European Commission
Contractors: 
ABB (Asea Brown Boveri)
Status: 
Closed
CRIS number: 
25840
Old reference: 
99-0012
Project reference: 
R2.01/96
Decision number: 
TACIS/1996/000-419
Method of procurement: 
Restricted Call for Tender
Signature date: 
29/06/1999
Effective contract date: 
29/06/1999
Contract end date: 
29/06/2001
Closure date: 
29/06/2001