Radioactive Waste Management in Bulgaria

 
Radioactive Waste Management in Bulgaria

Description

Beneficiary Organization Details

Bulgarian Nuclear Regulatory Agency
http://www.bnsa.bas.bg

Project Aims

The main objective of PHARE BG-9701-02-04-01 project was to assess the radioactive waste management situation in Bulgaria and prepare recommendations as appropriate for its improvement. Specifically, the particular objectives of the project were:

  • to define the radioactive waste management institutional arrangement and harmonize its legislative base and standards;
  • to review and propose a finalized solution for the intermediate and low level radioactive waste problem;
  • to provide a feasibility study on the future of the Novi Han disposal Facility for low and intermediate level radioactive wastes and a study on the wastes arising from NPP Kozloduy;
  • to provide a feasibility study on the disposal of low and intermediate level wastes in a new National facility;
  • to define the necessary national regulations and standards;
  • to define the structure, responsibilities and financial arrangements needed for establishment of a national radioactive waste management body.

Project Results

The main findings of the study were presented in a number of detailed reports and an Executive Summary was prepared on the main conclusions and recommendations of the study, set against each of the project tasks and objectives , as identified the project Terms of Reference. These main findings were grouped and presented in reports for each activity/ facility type as follows:

  • Disposal of NPP waste;
  • Existing Waste Disposal Facilities- Novi Han;
  • Infrastructure, Financing and Public Acceptability.

Further Project Results

Further information on the project results could be sought from the beneficiary organizations.


General Information

Title: 
Radioactive Waste Management in Bulgaria
Programme: 
PHARE
Budget year: 
1991
Countries: 
Bulgaria
Types of activities: 
Design safety
NPP: 
Kozloduy
Installation types: 
VVER-440/230 + 1000
Duration (months): 
233
Contractors: 
IAEA (International Atomic Energy Agency)
Cassiopee
SGN (Societe generale pour les techniques nouvelles)
Sub-contractors: 
Risk Engineering, Ltd, Bulgaria
Status: 
Completed
Old reference: 
BG.9107.02.04.01(PH/91)
Effective contract date: 
01/02/1996
Closure date: 
03/02/1997