RESIDUAL LIFETIME EVALUATION
RESIDUAL LIFETIME EVALUATION
Description
Objective
The objective of the project was to develop jointly with Russian experts a methodology to evaluate the rest lifetime of VVER 440/230 units and to recommend refurbishment and improvement to assure a safe and reliable short-term operation of the Novovoronezh NPP units 3 and 4. The results will apply to Kola as far as the methodology is concerned.
Result
- Development of a methodology for lifetime evaluation;
- Identification of weak points and major safety related problems;
- Transfer of Western experience in lifetime evaluation;
- Revision of the results from the Kozloduy 6 months Phare program were revised and definition of the differences to NPP Novovoronezh 3 and 4, then definition which parts could be transferred to NVV NPP;
- Determination of the present plant status and the expected lifetime in the future;
- Recommendations on refurbishment and improvements on a short-term basis.
General Information
Title:
RESIDUAL LIFETIME EVALUATION
Programme:
TACIS
Amount:
€ 410.063,45
Budget year:
1991
Countries:
Russia
Nature:
Services
Types of activities:
Design safety
Sector:
DS - Design safety (incl. Off-Site Emergency Preparedness)
NPP:
Novovoronezh
Duration (months):
11
Contracting authority:
European Commission
Partner (Beneficiary):
Rosenergoatom
Contractors:
Empresarios Agrupados
Status:
Closed
CRIS number:
22133
Old reference:
93-0488
Project reference:
R1.14/91
Decision number:
TACIS/1991/000-323
Method of procurement:
Restricted Call for Tender
Signature date:
12/07/1993
Effective contract date:
12/07/1993
Contract end date:
12/06/1994
Closure date:
12/06/1994