Review of Normal and Emergency Procedures

 
Review of Normal and Emergency Procedures

Description

Objectives

The overall objective was to provide assistance in the preparation, revision, validation, documentation interfaces and delivery requirements for the normal and emergency operating procedures at South Ukraine NPP.To this aim, the project was divided into 7 tasks:

Definition of methodology for emergency procedure development
Elaboration and verification of sample procedures
Elaboration, and verification of other procedures
Validation of all procedures
Definition of procedure licensing requirements
Review of control room design
Development of procedure management database
 

Results

According to the 7 objectives mentioned before, the results are summarized in the following:

Definition of methology for emergency procedure development

The guide describes how to perform all activities related to the operating procedures and include the last recommendations of the owner groups as well as man machine interface criteria

There are two different procedure guides, one for the normal operating procedures and one for the abnormal/emergency operating procedures.

Both guides are based on the requirements of the applicable national atomic energy company and SU-NPP codes, standards and procedures and take into account the applicable recommendations of international codes, standards, procedures and specifications.

Elaboration and verification of sample procedures

The general outcome of this task was to develop and verify a set of sample operating procedures. The process followed 3 steps:

  • establish the drafting team and exchange experiences on writing issues, in order to reach a common understanding of the elaboration guides application
  • establish the verification team and exchange experiences on verification issues, in order to reach a common understanding of the verification guide application
  • analyze experiences and comments from previous activities, in order to establish the way to proceed for the rest of procedures to be developed in this project.

Elaboration and verification of other procedures

The general objectives of these tasks were:

  • to draft the rest of procedures in the scope of this project
  • to carry out the verification of the set of operating procedures by local experts
  • to assess the work performed. Operating procedures were checked, to ensure that they meet all operational requirements and that they are technically accurate.

Validation of all procedures

The general result of this task is the validation of the selected set of operating procedures by local experts, following 2 steps:

  • validation of the set of operating procedures by local experts
  • check of operating procedures to ensure that they are consistent with the plant design, including that of the control room and display systems

Definition of procedure licensing requirements

This result supports South Ukraine NPP in the licensing activities related to this project with the Ukraine Regulatory Authority (NRA) by:

  • establishing a common basis for operating procedures licensing
  • definition of required documentation for procedure licensing
  • identification of the licensing documentation required by the authority
  • preparation by local experts of the licensing process of the operating procedures that were developed under this project

Review of control room design

Evaluation of the main and emergency control room design to check the possibility of the complete implementation of the operating procedures, through the following steps:

  • collection of the data package of control room design
  • evaluation of the information from control room to operator in normal operation
  • identification of instrumentation and physical configuration of control room reducing operator efficiency specially for abnormal plant operation and emergency scenarios
  • evaluation of deviations identified in the review process and indication of the recommended modifications or improvements.

Development of procedure management database

The general result of this task integrated and adapted procedures management system application for the SU-NPP through the following :

  • knowledge of the documentation management system of SUNPP
  • adaptation of the specification of the existing generic procedures management tool (PMT) with SUNPP specific criteria
  • adaptation of the existing software application to the specific needs of SU-NPP.

See attached document "U1.02-96B-Excerpt page 31-39 of Final Report SK-50800 as of Jan 2004"


General Information

Title: 
Review of Normal and Emergency Procedures
Programme: 
TACIS
Amount: 
€ 787.270,72
Budget year: 
1996
Countries: 
Ukraine
Nature: 
Services
Types of activities: 
Design safety
Sector: 
DS - Design safety (incl. Off-Site Emergency Preparedness)
Duration (months): 
17
Contracting authority: 
European Commission
Contractors: 
Tecnatom
Status: 
Closed
CRIS number: 
26106
Old reference: 
99-0278
Project reference: 
U1.02/96B
Decision number: 
TACIS/1996/000-419
Method of procurement: 
Restricted Call for Tender
Signature date: 
16/03/2000
Effective contract date: 
16/03/2000
Contract end date: 
16/08/2001
Closure date: 
16/08/2001