Safety Related Modernization of NPP with VVER 440-230
Safety Related Modernization of NPP with VVER 440-230
Description
Objective
The objective of the project was to support the Russian experts in an evaluation of technical solutions for a safety-related modernization of Novovoronezh Units 3 and 4.
Result
As a result of the project, recommendations for safety related modernizations were given for the following systems. For each item a relevant report has been written.
- Emergency core cooling system for high and low pressure operation.
- Spray systems.
- Cooling water systems for emergency core cooling facilities.
- Development of a new emergency feed water system.
- New emergency power distribution facilities for the new safety systems.
- Upgrading the relieve valves on the pressurizer.
- Upgrading the over pressure protection of the Steam Generator (SG) including fast acting isolation valves.
- Development of an emergency gas removal system from the 1st loop.
- Integrity proof of the confinement.
- Upgrading of the ventilation systems.
- Development of a system to automatically manage accidents in case of SG leakages between the 1st and the 2nd loop.
- Improvement of the core instrumentation and core control.
- Upgrading the reactor control and protection system.
- Upgrading the information system.
- Development of back-up shutdown centre.
The results have been of benefit to other plants with the same design (Kola, Kozloduy and Bohunice).
General Information
Title:
Safety Related Modernization of NPP with VVER 440-230
Programme:
TACIS
Amount:
€ 796.845,55
Budget year:
1991
Countries:
Russia
Nature:
Services
Types of activities:
Design safety
Sector:
DS - Design safety (incl. Off-Site Emergency Preparedness)
NPP:
Novovoronezh
Duration (months):
20
Contracting authority:
European Commission
Partner (Beneficiary):
Rosenergoatom
Contractors:
Belgatom
Status:
Closed
CRIS number:
22143
Old reference:
93-0501
Project reference:
R1.5/91
Decision number:
TACIS/1991/000-323
Method of procurement:
Restricted Call for Tender
Signature date:
22/07/1993
Effective contract date:
22/07/1993
Contract end date:
22/03/1995
Closure date:
22/03/1995