VVER 440-213 Instrumentation and Control system upgrading
VVER 440-213 Instrumentation and Control system upgrading
Description
Beneficiary Organisation details
Main Beneficiary
Dukovany NPP (Czech Republic)
www.cez.cz
Co-Beneficiary
Bohunice NPP (Slovak Republic)
www.seas.sk
Paks NPP (Hungary)
http://www.npp.hu/index-e.htm
Project Aims
Phase 1 and 2
- To establish that a need existed for updating the I&C;
- To define a final updated design concept for the overall I&C architecture;
- To define optimum scope and approach to be adopted in respect of replacing and / or upgrading existing systems;
- To prepare bid invitation documents, including detail requirements specifications for new systems and fort upgrading of existing ones;
- To specify bid evaluation methodology and criteria;
- To specify a Quality Assurance programme.
Phase 3
- Technical and commercial assistance and support during evaluation for submitted bid proposals and recommendation on bidder selection;
- Technical and commercial assistance during negotiation and preparation of contract packages;
- Support during completion of the design basis and preparation of plant data;
- Technical and management support during implementation and commissioning of the system upgrade;
- Training of Beneficiaries personnel involved in the upgrade process.
Project results
- Development of upgrade Concept for the I&C upgrading project;
- Providing the Design support including development of detailed technical specification that would enable CEZ to identify potential Suppliers capable of meeting the requirements;
- Providing the licensing support for the I&C upgrading project;
- Elaboration of the Bid inquiry packages;
- Providing the general technical support during the bid evaluation and contract award phases support.
Further Project Results
Further information on the project results could be obtained from the beneficiary organisations.
General Information
Title:
VVER 440-213 Instrumentation and Control system upgrading
Programme:
PHARE
Budget year:
1993
Countries:
Czech Republic
Types of activities:
Design safety
NPP:
Dukovany
Installation types:
VVER 440-213
Duration (months):
234
Contractors:
National Nuclear Corporation
Sub-contractors:
None
Status:
Completed
Old reference:
PHARE 4.2.2/93
Effective contract date:
21/12/1995
Closure date:
14/04/1997