Objective
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2007 (1) Apply 2007 filter
- 2006 (3) Apply 2006 filter
- 2005 (6) Apply 2005 filter
- 2004 (3) Apply 2004 filter
- 2003 (12) Apply 2003 filter
- 2002 (9) Apply 2002 filter
- 2001 (3) Apply 2001 filter
- 2000 (1) Apply 2000 filter
- 1999 (2) Apply 1999 filter
- 1998 (2) Apply 1998 filter
- 1997 (13) Apply 1997 filter
- 1996 (17) Apply 1996 filter
- 1995 (22) Apply 1995 filter
- 1994 (24) Apply 1994 filter
- 1993 (17) Apply 1993 filter
- 1992 (11) Apply 1992 filter
- (-) Remove 1991 filter 1991 (35)
- 1990 (3) Apply 1990 filter
Contract information field: Status
Contract information field: Contractor
- Areva (8) Apply Areva filter
- Empresarios Agrupados (4) Apply Empresarios Agrupados filter
- Westinghouse (4) Apply Westinghouse filter
- Belgatom (3) Apply Belgatom filter
- Siemens (3) Apply Siemens filter
- IAEA (International Atomic Energy Agency) (2) Apply IAEA (International Atomic Energy Agency) filter
- Ansaldo STS (1) Apply Ansaldo STS filter
- ATOS ORIGIN BELGIUM SA (1) Apply ATOS ORIGIN BELGIUM SA filter
- Cassiopee (1) Apply Cassiopee filter
- EDF (Electricite de France) (1) Apply EDF (Electricite de France) filter
- ENAC (European Nuclear Assistance Consortium) (1) Apply ENAC (European Nuclear Assistance Consortium) filter
- Enel (1) Apply Enel filter
- Framatome (1) Apply Framatome filter
- Intercontrole (1) Apply Intercontrole filter
- Magnox Electric (1) Apply Magnox Electric filter
- Nukem (1) Apply Nukem filter
- RPII (Radiological Protection Institute of Ireland) (1) Apply RPII (Radiological Protection Institute of Ireland) filter
- SGN (Societe generale pour les techniques nouvelles) (1) Apply SGN (Societe generale pour les techniques nouvelles) filter
- Tecnatom (1) Apply Tecnatom filter
Contract information field: Sector
Contract information field: Types of activities
- (-) Remove Design safety filter Design safety (35)
- Studies (28) Apply Studies filter
- On Site Assistance (10) Apply On Site Assistance filter
- Mitigation of Chernobyl accident (6) Apply Mitigation of Chernobyl accident filter
- Technical Support Organisations (4) Apply Technical Support Organisations filter
- Emergency Preparedness (3) Apply Emergency Preparedness filter
- Probabilistic Safety Analysis (2) Apply Probabilistic Safety Analysis filter
- RBMK studies (2) Apply RBMK studies filter
- Regulatory Authorities (2) Apply Regulatory Authorities filter
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Background
The accident at the Chernobyl Nuclear Power Plant in Ukraine in April 1986 demonstrated the need for adequate radiation early warning systems that allow authorities to take appropriate and timely actions in the event of a major radiological accident.
Objective
This project on Reactor Vessel embrittlement was identified in the very early stage (1991) of the TACIS and PHARE programmes for nuclear safety as a main topic.
Objective
The objective of the project was to develop a residual life time diagnostic system based both on existing Russian developments and on the Contractor’s experience. This system was to be implemented on operating VVER-NPPs.
Result
Objective
Objective
Objective
Objective
Objective
The objective of the project was to study whether the LBB concept can be applied to the piping system of VVER 440/230 and to assess the possibility to achieve, under certain conditions, a high reliability level. More precisely, it was analysed:
Objective
Objective
Task 1:
Establish a clear basis for a seismic design review.
Objective
The objective of the project was to improve the existing active fire fighting system, to increase passive and active fire protection and to review secondary effects mitigation of the Novovoronezh and Kola NPPs as first application.
Objective
With this project training on NDT equipment should be given.
The equipment’s origin was Intercontrole, France. (The NDT-equipment for which the training was performed, has been financed from other than Tacis funding).
Result
Objective
The objective of this project consisted of 3 tasks
Task 1: Vent Stack Radioactive Release Measurement Upgrade
Objective
The objective of the project was to analyse the current leak rate of the confinement for VVER-230 reactors and consequently to propose how to decrease it drastically.