Background
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2005 (1) Apply 2005 filter
- 2004 (6) Apply 2004 filter
- 2003 (13) Apply 2003 filter
- 2002 (5) Apply 2002 filter
- 2001 (4) Apply 2001 filter
- 2000 (5) Apply 2000 filter
- (-) Remove 1999 filter 1999 (22)
- 1998 (8) Apply 1998 filter
- 1997 (16) Apply 1997 filter
- 1996 (22) Apply 1996 filter
- 1995 (30) Apply 1995 filter
- 1994 (49) Apply 1994 filter
- 1993 (10) Apply 1993 filter
- 1992 (30) Apply 1992 filter
- (-) Remove 1991 filter 1991 (22)
Contract information field: Status
Contract information field: Contractor
- Areva (5) Apply Areva filter
- Empresarios Agrupados (3) Apply Empresarios Agrupados filter
- Belgatom (2) Apply Belgatom filter
- AEP (Atomenergoproekt) (1) Apply AEP (Atomenergoproekt) filter
- Ansaldo STS (1) Apply Ansaldo STS filter
- ATOS ORIGIN BELGIUM SA (1) Apply ATOS ORIGIN BELGIUM SA filter
- EDF (Electricite de France) (1) Apply EDF (Electricite de France) filter
- Enel (1) Apply Enel filter
- Framatome (1) Apply Framatome filter
- Magnox Electric (1) Apply Magnox Electric filter
- Nukem (1) Apply Nukem filter
- SGN (Societe generale pour les techniques nouvelles) (1) Apply SGN (Societe generale pour les techniques nouvelles) filter
- Tecnatom (1) Apply Tecnatom filter
- TVONS (TVO Nuclear Services Oy) (1) Apply TVONS (TVO Nuclear Services Oy) filter
Contract information field: Sector
- DS - Design safety (incl. Off-Site Emergency Preparedness) (17) Apply DS - Design safety (incl. Off-Site Emergency Preparedness) filter
- RA - Regulatory Authorities (1) Apply RA - Regulatory Authorities filter
- WDS - Waste, Decommissioning and Safeguards (1) Apply WDS - Waste, Decommissioning and Safeguards filter
Contract information field: Types of activities
- Design safety (17) Apply Design safety filter
- Equipment Supply (1) Apply Equipment Supply filter
- On Site Assistance (1) Apply On Site Assistance filter
- Probabilistic Safety Analysis (1) Apply Probabilistic Safety Analysis filter
- RBMK studies (1) Apply RBMK studies filter
- Waste Management (1) Apply Waste Management filter
Contract information field: Partner (Beneficiary)
- (-) Remove Rosenergoatom filter Rosenergoatom (21)
- (-) Remove Ministry of Fuel and Energy of Ukraine filter Ministry of Fuel and Energy of Ukraine (1)
- EnergoAtom (3) Apply EnergoAtom filter
- Armenian Nuclear Power Plant (1) Apply Armenian Nuclear Power Plant filter
- Armenian Nuclear Regulatory Authority (ANRA) (1) Apply Armenian Nuclear Regulatory Authority (ANRA) filter
- Chernobyl NPP (1) Apply Chernobyl NPP filter
- GAN (Ukraine) (1) Apply GAN (Ukraine) filter
- Gosatomnadzor (1) Apply Gosatomnadzor filter
- MEPNS in Ukraine & Ministry of EMERCOM in Belarus (1) Apply MEPNS in Ukraine & Ministry of EMERCOM in Belarus filter
- Ministry for Emergency Situations (Belarus) (1) Apply Ministry for Emergency Situations (Belarus) filter
- whole Ukrainian nuclear sector (1) Apply whole Ukrainian nuclear sector filter
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Objective
The objective of the project was to develop a complete and coherent Quality Assurance (QA) Program for operation of Russian NPPs in order to improve as quickly as possible the operating safety of these plants.
Result (General)
Kola 1&2 - Novovoronezh 3&4
REPORTS
1 Progress Report 1st Quarterly Report 25/02/1994
2 Progress Report 2nd Quarterly Report 25/05/1994
3 Progress Report 3rd Quarterly Report 6/10/1994
4 Progress Report 4th Quarterly Report 13/01/1995
Objective
1) Background
Background
Kola NPP located in Murmansk Oblast in north western Russia comprised 4 power units of VVER 440 type reactors. Unit 1 is in operation since 1973, unit 2 since 1974, unit 3 since 1982 and unit 4 since 1984.
Objective
Objective
Objective
Objective
Objective
Objective
Objective
This project on Reactor Vessel embrittlement was identified in the very early stage (1991) of the TACIS and PHARE programmes for nuclear safety as a main topic.
Objective
Objective
Objective
The objective of the project was to study whether the LBB concept can be applied to the piping system of VVER 440/230 and to assess the possibility to achieve, under certain conditions, a high reliability level. More precisely, it was analysed:
Objective
Objective
Task 1:
Establish a clear basis for a seismic design review.
Objective
The objective of the project was to improve the existing active fire fighting system, to increase passive and active fire protection and to review secondary effects mitigation of the Novovoronezh and Kola NPPs as first application.