Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- (-) Remove 2016 filter 2016 (38)
- 2007 (1) Apply 2007 filter
- 2006 (1) Apply 2006 filter
- (-) Remove 2005 filter 2005 (38)
- 2004 (1) Apply 2004 filter
- 2003 (3) Apply 2003 filter
- 2002 (3) Apply 2002 filter
- 1997 (5) Apply 1997 filter
- (-) Remove 1996 filter 1996 (38)
- 1995 (6) Apply 1995 filter
- 1994 (7) Apply 1994 filter
- 1993 (5) Apply 1993 filter
- 1992 (3) Apply 1992 filter
- (-) Remove 1991 filter 1991 (38)
Contract information field: Status
Contract information field: Contractor
- Areva (11) Apply Areva filter
- Belgatom (4) Apply Belgatom filter
- Empresarios Agrupados (3) Apply Empresarios Agrupados filter
- Tecnatom (3) Apply Tecnatom filter
- Magnox Electric (2) Apply Magnox Electric filter
- National Nuclear Corporation (2) Apply National Nuclear Corporation filter
- Siemens (2) Apply Siemens filter
- ABB (Asea Brown Boveri) (1) Apply ABB (Asea Brown Boveri) filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- Ansaldo STS (1) Apply Ansaldo STS filter
- ATOS ORIGIN BELGIUM SA (1) Apply ATOS ORIGIN BELGIUM SA filter
- EDF (Electricite de France) (1) Apply EDF (Electricite de France) filter
- Enel (1) Apply Enel filter
- EUROPEAN NUCLEAR ASSISTANCE CONSORTIUM (1) Apply EUROPEAN NUCLEAR ASSISTANCE CONSORTIUM filter
- EWN (Energiewerke Nord) (1) Apply EWN (Energiewerke Nord) filter
- Framatome (1) Apply Framatome filter
- Nukem (1) Apply Nukem filter
- TES (1) Apply TES filter
Contract information field: Sector
Contract information field: Types of activities
- (-) Remove Design safety filter Design safety (36)
- (-) Remove Probabilistic Safety Analysis filter Probabilistic Safety Analysis (2)
- Training (4) Apply Training filter
- Equipment Supply (3) Apply Equipment Supply filter
- On Site Assistance (2) Apply On Site Assistance filter
- RBMK studies (2) Apply RBMK studies filter
- Waste Management (2) Apply Waste Management filter
- Emergency Preparedness (1) Apply Emergency Preparedness filter
- Technical Support Organisations (1) Apply Technical Support Organisations filter
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
- (-) Remove Services filter Services (38)
Contract information field: Method of procurement
Objective
Objective
Objective
Objective
Objective
The primary objectives of this project were:
Objective
This project on Reactor Vessel embrittlement was identified in the very early stage (1991) of the TACIS and PHARE programmes for nuclear safety as a main topic.
Objective
The objective of the project was to develop a residual life time diagnostic system based both on existing Russian developments and on the Contractor’s experience. This system was to be implemented on operating VVER-NPPs.
Result
Objective
Objective
Objective
Objective
Objective
The objective of the project was to study whether the LBB concept can be applied to the piping system of VVER 440/230 and to assess the possibility to achieve, under certain conditions, a high reliability level. More precisely, it was analysed:
Objective
Objective
Task 1:
Establish a clear basis for a seismic design review.
Objective
The objective of the project was to improve the existing active fire fighting system, to increase passive and active fire protection and to review secondary effects mitigation of the Novovoronezh and Kola NPPs as first application.
Objective
The objective of this project consisted of 3 tasks
Task 1: Vent Stack Radioactive Release Measurement Upgrade
Objective
The objective of the project was to analyse the current leak rate of the confinement for VVER-230 reactors and consequently to propose how to decrease it drastically.