1) Background
Reliability of valves used for controlling the essential systems is a major element influencing the operational safety of NPPs. Operating NPPs in Ukraine contain approximately 5000 foreign-made valves of Western European supply.
Search
2 results recovered
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- (-) Remove 2016 filter 2016 (2)
- 1997 (1) Apply 1997 filter
- (-) Remove 1996 filter 1996 (2)
- 1993 (1) Apply 1993 filter
- (-) Remove 1991 filter 1991 (2)
Contract information field: Status
Contract information field: Contractor
- (-) Remove EDF (Electricite de France) filter EDF (Electricite de France) (2)
- ATOS ORIGIN BELGIUM SA (2) Apply ATOS ORIGIN BELGIUM SA filter
- PA Consulting Group (2) Apply PA Consulting Group filter
- Tecnatom (2) Apply Tecnatom filter
- Areva (1) Apply Areva filter
- CAG TECHNOLOGIE MANAGEMENT CONSULTANTS GREIFSWALD GMBH (1) Apply CAG TECHNOLOGIE MANAGEMENT CONSULTANTS GREIFSWALD GMBH filter
- EUROPEAN NUCLEAR ASSISTANCE CONSORTIUM (1) Apply EUROPEAN NUCLEAR ASSISTANCE CONSORTIUM filter
- Luxconsult (1) Apply Luxconsult filter
- National Nuclear Corporation (1) Apply National Nuclear Corporation filter
- RPII (Radiological Protection Institute of Ireland) (1) Apply RPII (Radiological Protection Institute of Ireland) filter
- Siemens (1) Apply Siemens filter
- STUK (Sateilyturvakeskus) (1) Apply STUK (Sateilyturvakeskus) filter
- svt Brandschutz (1) Apply svt Brandschutz filter
Contract information field: Sector
- (-) Remove DS - Design safety (incl. Off-Site Emergency Preparedness) filter DS - Design safety (incl. Off-Site Emergency Preparedness) (2)
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nature
Contract information field: Method of procurement
Countries:
Ukraine
Programme:
TACIS
Budget year:
1996
Amount:
€ 544.652,93
Countries:
Ukraine
Programme:
TACIS
Budget year:
1996
Amount:
€ 3.790.545,00
1) Background Ukrainian government was always considering completion and upgrading of 2 VVER units: Rovno-4 and Khmelnitsky-2 (R4K2), whose construction was stopped in the late 80’s.