The overall objective is to conduct an integrated environmental impact assessment (EIA) and feasibility study (FS) of the possible remediation and related management activities for the Mailuu-Suu uranium production legacy site.
Search
Contract information field: Programme
Contract information field: Country
- (-) Remove Russia filter Russia (81)
- (-) Remove Kazakhstan filter Kazakhstan (7)
- (-) Remove Kyrgyzstan filter Kyrgyzstan (2)
- Ukraine (60) Apply Ukraine filter
- Bulgaria (20) Apply Bulgaria filter
- European Union (13) Apply European Union filter
- Czech Republic (9) Apply Czech Republic filter
- Slovakia (8) Apply Slovakia filter
- Belarus (6) Apply Belarus filter
- Armenia (5) Apply Armenia filter
- Hungary (4) Apply Hungary filter
- Lithuania (4) Apply Lithuania filter
- China (1) Apply China filter
- Iran (1) Apply Iran filter
- Jordan (1) Apply Jordan filter
- Mongolia (1) Apply Mongolia filter
- Poland (1) Apply Poland filter
- Romania (1) Apply Romania filter
- Tajikistan (1) Apply Tajikistan filter
Contract information field: Budget year
- (-) Remove 2016 filter 2016 (87)
- 2014 (1) Apply 2014 filter
- 2013 (3) Apply 2013 filter
- 2011 (2) Apply 2011 filter
- 2010 (2) Apply 2010 filter
- 2009 (3) Apply 2009 filter
- 2008 (3) Apply 2008 filter
- 2007 (2) Apply 2007 filter
- 2006 (4) Apply 2006 filter
- 2005 (16) Apply 2005 filter
- 2004 (31) Apply 2004 filter
- 2003 (35) Apply 2003 filter
- 2002 (19) Apply 2002 filter
- 2001 (12) Apply 2001 filter
- 2000 (15) Apply 2000 filter
- 1999 (16) Apply 1999 filter
- 1998 (21) Apply 1998 filter
- (-) Remove 1997 filter 1997 (87)
- 1996 (75) Apply 1996 filter
- 1995 (62) Apply 1995 filter
- 1994 (94) Apply 1994 filter
- 1993 (37) Apply 1993 filter
- 1992 (56) Apply 1992 filter
- (-) Remove 1991 filter 1991 (87)
Contract information field: Status
Contract information field: Contractor
- AMEC (9) Apply AMEC filter
- Areva (8) Apply Areva filter
- EDF (Electricite de France) (5) Apply EDF (Electricite de France) filter
- Italtrend (4) Apply Italtrend filter
- Riskaudit (4) Apply Riskaudit filter
- Belgatom (3) Apply Belgatom filter
- CIT (3) Apply CIT filter
- Empresarios Agrupados (3) Apply Empresarios Agrupados filter
- Framatome (3) Apply Framatome filter
- JRC (Joint Research Centre - European Commission) (3) Apply JRC (Joint Research Centre - European Commission) filter
- Alstom (2) Apply Alstom filter
- Magnox Electric (2) Apply Magnox Electric filter
- AEP (Atomenergoproekt) (1) Apply AEP (Atomenergoproekt) filter
- Ansaldo STS (1) Apply Ansaldo STS filter
- ATOS ORIGIN BELGIUM SA (1) Apply ATOS ORIGIN BELGIUM SA filter
- BERRY (1) Apply BERRY filter
- Birkhofer (1) Apply Birkhofer filter
- British Energy (1) Apply British Energy filter
- DC - Hadler Networks (1) Apply DC - Hadler Networks filter
- DETAMPEL (1) Apply DETAMPEL filter
- Diaprom (1) Apply Diaprom filter
- Doerler Mesures (1) Apply Doerler Mesures filter
- EGTM (1) Apply EGTM filter
- Enel (1) Apply Enel filter
- EURISYS (1) Apply EURISYS filter
- FLIR (1) Apply FLIR filter
- Fortum (1) Apply Fortum filter
- Fujitsu (1) Apply Fujitsu filter
- GRELL (1) Apply GRELL filter
- HAIGH (1) Apply HAIGH filter
- IMC (International Mining Consultants) (1) Apply IMC (International Mining Consultants) filter
- IntelligeNDT (1) Apply IntelligeNDT filter
- Intercontrole (1) Apply Intercontrole filter
- KGG (Kernkraftwerk Gundremmingen) (1) Apply KGG (Kernkraftwerk Gundremmingen) filter
- LETI (1) Apply LETI filter
- National Nuclear Corporation (1) Apply National Nuclear Corporation filter
- Nukem (1) Apply Nukem filter
- PA Consulting Group (1) Apply PA Consulting Group filter
- Parcol (1) Apply Parcol filter
- RRCKI ( Russian Research Centre Kurchatov Institute) (1) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- SCK CEN (Centre d'Etude de l'Energie Nucleaire) (1) Apply SCK CEN (Centre d'Etude de l'Energie Nucleaire) filter
- SEMA Group (1) Apply SEMA Group filter
- Suez Tractebel (1) Apply Suez Tractebel filter
- Tecnatom (1) Apply Tecnatom filter
- TUV Rheinland (1) Apply TUV Rheinland filter
- TVONS (TVO Nuclear Services Oy) (1) Apply TVONS (TVO Nuclear Services Oy) filter
Contract information field: Sector
- DS - Design safety (incl. Off-Site Emergency Preparedness) (31) Apply DS - Design safety (incl. Off-Site Emergency Preparedness) filter
- HI - Horizontal Issues (13) Apply HI - Horizontal Issues filter
- RA - Regulatory Authorities (6) Apply RA - Regulatory Authorities filter
- WDS - Waste, Decommissioning and Safeguards (6) Apply WDS - Waste, Decommissioning and Safeguards filter
Contract information field: Types of activities
- Design safety (25) Apply Design safety filter
- Equipment Supply (18) Apply Equipment Supply filter
- Studies (18) Apply Studies filter
- On Site Assistance (8) Apply On Site Assistance filter
- Technical Support Organisations (4) Apply Technical Support Organisations filter
- Fuel Cycle (2) Apply Fuel Cycle filter
- Probabilistic Safety Analysis (2) Apply Probabilistic Safety Analysis filter
- RBMK studies (2) Apply RBMK studies filter
- Safeguards (2) Apply Safeguards filter
- Emergency Preparedness (1) Apply Emergency Preparedness filter
- Mitigation of Chernobyl accident (1) Apply Mitigation of Chernobyl accident filter
- Regulatory Authorities (1) Apply Regulatory Authorities filter
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- Novovoronezh (9) Apply Novovoronezh filter
- Beloyarsk (6) Apply Beloyarsk filter
- Kola (5) Apply Kola filter
- Balakovo (3) Apply Balakovo filter
- Kalinin (3) Apply Kalinin filter
- Smolensk (3) Apply Smolensk filter
- Aktau (1) Apply Aktau filter
- Leningrad (Sosnovy Bor) (1) Apply Leningrad (Sosnovy Bor) filter
Contract information field: Nature
Contract information field: Method of procurement
- Direct Agreement (36) Apply Direct Agreement filter
- Restricted Call for Tender (33) Apply Restricted Call for Tender filter
- Special Fund (Procurement Agent) (12) Apply Special Fund (Procurement Agent) filter
- Informal Consultation (2) Apply Informal Consultation filter
- Open Call for Tender (2) Apply Open Call for Tender filter
- Administrative Arrangement (1) Apply Administrative Arrangement filter
Objective
Background
Background
Objective
Objective
The objective of the project is to equip the BN 600 NPP with hardware, software and procedures for thermal visual inspection of the high voltage equipment for timely prevention of the accidents at the BN 600 NPP.
Beloyarsk Process Monitoring System (see projects R1.06/95E and R1.06/96B)
Background
Background
The feedwater control valves ensured, together with the variable speed feedwater pumps, the control of the feedwater flow to - and of the level in - the Steam Generators (SG’s).
Objectives
Two prototypes of ECCS-pump (Emergency Core Cooling System) intake filters were designed, supplied and installed in the framework of this project, including the budget of project R1.02/96C.
Objective
Background
6kV circuit breakers originally installed in the units at Balakovo NPP are of the VES-6 type, and the related cabinets are of KE-6 type. Their supplier is Rovno high voltage equipment plant, Ukraine.
Objective
The objective of the project was to develop a complete and coherent Quality Assurance (QA) Program for operation of Russian NPPs in order to improve as quickly as possible the operating safety of these plants.
Result (General)
Kola 1&2 - Novovoronezh 3&4
REPORTS
1 Progress Report 1st Quarterly Report 25/02/1994
2 Progress Report 2nd Quarterly Report 25/05/1994
3 Progress Report 3rd Quarterly Report 6/10/1994
4 Progress Report 4th Quarterly Report 13/01/1995
Objective
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 96, continued with TACIS 97 with the same Western and Eastern Utility.
Objective
Background
Objective
Background