Objective
The primary objectives of this project were:
Navigation path
Objective
The primary objectives of this project were:
Objective
This project on Reactor Vessel embrittlement was identified in the very early stage (1991) of the TACIS and PHARE programmes for nuclear safety as a main topic.
Objective
The objective of the project was to develop a residual life time diagnostic system based both on existing Russian developments and on the Contractor’s experience. This system was to be implemented on operating VVER-NPPs.
Result
Objective
Objective
This project is part of a multi-annual project consisting of 4 parts spread over 6 budget years.
Objective
The aim of the project was to support Minatom in developing two public nuclear energy information centres, one in St. Petersburg and the second close to the Balakovo NPP.
Objective
Objective
Objective
Objective
The objective of the project was to study whether the LBB concept can be applied to the piping system of VVER 440/230 and to assess the possibility to achieve, under certain conditions, a high reliability level. More precisely, it was analysed:
Objective
Objective
Task 1:
Establish a clear basis for a seismic design review.
Objective
The objective of the project was to improve the existing active fire fighting system, to increase passive and active fire protection and to review secondary effects mitigation of the Novovoronezh and Kola NPPs as first application.
More information on the outcome of the project is under preparation.
Objective
The objective of the work was to review the safety of the RBMK reactors in nine technical areas:
Background
The accident at the Chernobyl Nuclear Power Plant in Ukraine in April 1986 demonstrated the need for adequate radiation early warning systems that allow authorities to take appropriate and timely actions in the event of a major radiological accident.
Objective
With this project training on NDT equipment should be given.
The equipment’s origin was Intercontrole, France. (The NDT-equipment for which the training was performed, has been financed from other than Tacis funding).
Result
Objective
The objective of this project consisted of 3 tasks
Task 1: Vent Stack Radioactive Release Measurement Upgrade
Objective