Objective
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- (-) Remove Areva filter Areva (8)
- (-) Remove Intercontrole filter Intercontrole (1)
- (-) Remove EURISYS filter EURISYS (0)
- Empresarios Agrupados (4) Apply Empresarios Agrupados filter
- Westinghouse (4) Apply Westinghouse filter
- Belgatom (3) Apply Belgatom filter
- Siemens (3) Apply Siemens filter
- IAEA (International Atomic Energy Agency) (2) Apply IAEA (International Atomic Energy Agency) filter
- Ansaldo STS (1) Apply Ansaldo STS filter
- ATOS ORIGIN BELGIUM SA (1) Apply ATOS ORIGIN BELGIUM SA filter
- Cassiopee (1) Apply Cassiopee filter
- EDF (Electricite de France) (1) Apply EDF (Electricite de France) filter
- ENAC (European Nuclear Assistance Consortium) (1) Apply ENAC (European Nuclear Assistance Consortium) filter
- Enel (1) Apply Enel filter
- Framatome (1) Apply Framatome filter
- Magnox Electric (1) Apply Magnox Electric filter
- Nukem (1) Apply Nukem filter
- RPII (Radiological Protection Institute of Ireland) (1) Apply RPII (Radiological Protection Institute of Ireland) filter
- SGN (Societe generale pour les techniques nouvelles) (1) Apply SGN (Societe generale pour les techniques nouvelles) filter
- Tecnatom (1) Apply Tecnatom filter
Contract information field: Sector
Contract information field: Types of activities
- (-) Remove Design safety filter Design safety (9)
- Studies (2) Apply Studies filter
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Objective
Objective
This project on Reactor Vessel embrittlement was identified in the very early stage (1991) of the TACIS and PHARE programmes for nuclear safety as a main topic.
Objective
The objective of the project was to develop a residual life time diagnostic system based both on existing Russian developments and on the Contractor’s experience. This system was to be implemented on operating VVER-NPPs.
Result
Objective
Objective
The objective of the project was to study whether the LBB concept can be applied to the piping system of VVER 440/230 and to assess the possibility to achieve, under certain conditions, a high reliability level. More precisely, it was analysed:
Objective
With this project training on NDT equipment should be given.
The equipment’s origin was Intercontrole, France. (The NDT-equipment for which the training was performed, has been financed from other than Tacis funding).
Result
Objective
The objective of this project consisted of 3 tasks
Task 1: Vent Stack Radioactive Release Measurement Upgrade