Objective
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- (-) Remove Areva filter Areva (8)
- (-) Remove Intercontrole filter Intercontrole (1)
- (-) Remove EURISYS filter EURISYS (0)
- (-) Remove TUV Rheinland filter TUV Rheinland (0)
- Empresarios Agrupados (4) Apply Empresarios Agrupados filter
- Westinghouse (4) Apply Westinghouse filter
- Belgatom (3) Apply Belgatom filter
- Siemens (3) Apply Siemens filter
- IAEA (International Atomic Energy Agency) (2) Apply IAEA (International Atomic Energy Agency) filter
- Ansaldo STS (1) Apply Ansaldo STS filter
- ATOS ORIGIN BELGIUM SA (1) Apply ATOS ORIGIN BELGIUM SA filter
- Cassiopee (1) Apply Cassiopee filter
- EDF (Electricite de France) (1) Apply EDF (Electricite de France) filter
- ENAC (European Nuclear Assistance Consortium) (1) Apply ENAC (European Nuclear Assistance Consortium) filter
- Enel (1) Apply Enel filter
- Framatome (1) Apply Framatome filter
- Magnox Electric (1) Apply Magnox Electric filter
- Nukem (1) Apply Nukem filter
- RPII (Radiological Protection Institute of Ireland) (1) Apply RPII (Radiological Protection Institute of Ireland) filter
- SGN (Societe generale pour les techniques nouvelles) (1) Apply SGN (Societe generale pour les techniques nouvelles) filter
- Tecnatom (1) Apply Tecnatom filter
Contract information field: Sector
Contract information field: Types of activities
- (-) Remove Design safety filter Design safety (9)
- Studies (3) Apply Studies filter
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Objective
Objective
With this project training on NDT equipment should be given.
The equipment’s origin was Intercontrole, France. (The NDT-equipment for which the training was performed, has been financed from other than Tacis funding).
Result
Objective
The objective of this project consisted of 3 tasks
Task 1: Vent Stack Radioactive Release Measurement Upgrade
Objective
This project on Reactor Vessel embrittlement was identified in the very early stage (1991) of the TACIS and PHARE programmes for nuclear safety as a main topic.
Objective
The objective of the project was to develop a residual life time diagnostic system based both on existing Russian developments and on the Contractor’s experience. This system was to be implemented on operating VVER-NPPs.
Result
Objective
Objective
The objective of the project was to study whether the LBB concept can be applied to the piping system of VVER 440/230 and to assess the possibility to achieve, under certain conditions, a high reliability level. More precisely, it was analysed: