Full title of the project
Services required for detailed design studies aiming at defining the optimal solution for the qualification of the LBB concept of the primary circuit including the surge line at the Unit 2 of ANPP.
Navigation path
Full title of the project
Services required for detailed design studies aiming at defining the optimal solution for the qualification of the LBB concept of the primary circuit including the surge line at the Unit 2 of ANPP.
Background
Objectives
Background
Background
Introduction
Objectives
Objective
Objectives
Introduction
The LBB (Leak Before Break) project was a part of the OSA project activities for Medzamor NPP unit 2. The on site utility in Medzamor NPP during the project was Sogin. The Contractor of the LBB/LDS project was Ansaldo Energia in consortium with Empresarios Agrupados and KONEXP (Russia).
Objective
Objective
This project aimed at replacing the obsolete radiological Instrumentation and increase capability of the plant radiation monitoring system.
Result
Objective
This Project description is a general description of the whole TACIS Nuclear Programme. It has not been established in the way as any other Tacis project listed in this data base.