Project Aims
The objective of the project consisted in delivering and installing communication equipment in order to improve the communication for Off-site Emergency preparedness in Kazakhstan and Ukraine.
Search
Contract information field: Programme
Contract information field: Country
- (-) Remove Kazakhstan filter Kazakhstan (11)
- Russia (115) Apply Russia filter
- Ukraine (89) Apply Ukraine filter
- Czech Republic (27) Apply Czech Republic filter
- Slovakia (16) Apply Slovakia filter
- Belarus (13) Apply Belarus filter
- Bulgaria (13) Apply Bulgaria filter
- Armenia (12) Apply Armenia filter
- Hungary (12) Apply Hungary filter
- Lithuania (10) Apply Lithuania filter
- Romania (9) Apply Romania filter
- European Union (7) Apply European Union filter
- Latvia (6) Apply Latvia filter
- Slovenia (4) Apply Slovenia filter
- Poland (3) Apply Poland filter
- Estonia (2) Apply Estonia filter
- Georgia (1) Apply Georgia filter
Contract information field: Budget year
- 2014 (1) Apply 2014 filter
- 2013 (2) Apply 2013 filter
- 2010 (1) Apply 2010 filter
- 2008 (1) Apply 2008 filter
- 2005 (1) Apply 2005 filter
- 2004 (3) Apply 2004 filter
- (-) Remove 2003 filter 2003 (11)
- 2002 (1) Apply 2002 filter
- (-) Remove 2001 filter 2001 (11)
- (-) Remove 2000 filter 2000 (11)
- 1998 (4) Apply 1998 filter
- 1997 (7) Apply 1997 filter
- 1996 (6) Apply 1996 filter
- (-) Remove 1995 filter 1995 (11)
- 1994 (6) Apply 1994 filter
- 1993 (4) Apply 1993 filter
Contract information field: Status
Contract information field: Contractor
- Alstom (2) Apply Alstom filter
- Carl Zeiss (1) Apply Carl Zeiss filter
- Deutsche Exide StanBy (1) Apply Deutsche Exide StanBy filter
- European Procurement Agents en SPRL (1) Apply European Procurement Agents en SPRL filter
- Iberdrola (1) Apply Iberdrola filter
- Italtrend (1) Apply Italtrend filter
- Lloyd Instruments (1) Apply Lloyd Instruments filter
- Riskaudit (1) Apply Riskaudit filter
- Roeii Amsier (1) Apply Roeii Amsier filter
- UNIT EXPORT (1) Apply UNIT EXPORT filter
Contract information field: Sector
- DS - Design safety (incl. Off-Site Emergency Preparedness) (1) Apply DS - Design safety (incl. Off-Site Emergency Preparedness) filter
- RA - Regulatory Authorities (1) Apply RA - Regulatory Authorities filter
- WDS - Waste, Decommissioning and Safeguards (1) Apply WDS - Waste, Decommissioning and Safeguards filter
Contract information field: Types of activities
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme”, it was decided to improve the passive fire protection facilities of the BN-350 NPP (fast breeder) in Aktau, Kazakhstan. The project was divided into three lots:
Only general contract information avail
Objectives
Background
Background