Objective
The structural integrity of RBMK fuel channels and their interaction with the Graphite blocks governs the safe lifetime of the reactor core.
Navigation path
Objective
The structural integrity of RBMK fuel channels and their interaction with the Graphite blocks governs the safe lifetime of the reactor core.
Objective
Objective
Objectives
The LBB (Leak Before Break) project was a part of the OSA project activities for Medzamor NPP unit 2. The on site utility in Medzamor NPP during the project was Sogin. The Contractor of the LBB/LDS project was Ansaldo Energia in consortium with Empresarios Agrupados and KONEXP (Russia).
Objectives