Objective R1.01/93
This On-Site-Assistance, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases the OSA was performed by an EU utility, working with a team of Western and Russian experts.
Navigation path
Objective R1.01/93
This On-Site-Assistance, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases the OSA was performed by an EU utility, working with a team of Western and Russian experts.
R1.05/94
Objective
This contract, signed in September 1997, included two separate projects of the TACIS 1995 programme.
Project R5.01/95: Establishment of the Russian Methodology and Training Centre (RMTC), Phase 3
Background
More information on the outcome of the project is under preparation.
Objectives
Objectives
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 96 with the same Western and Eastern Utilities and NPPs.
Objective
Objective
The project deals with general site assistance on Smolensk NPP.
Objective
Background
Objectives
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 95 with the same Western and Eastern Utilities and NPPs.
Objective R1.02/93
This “On-Site-Assistance”, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases, the OSA was performed by an EU utility, working with a team of Western and Russian experts.
Objective R1.03/93
This “On-Site-Assistance”, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases, the OSA was performed by an EU utility, working with a team of Western and Russian experts.