Objective
With this project training on NDT equipment should be given.
The equipment’s origin was Intercontrole, France. (The NDT-equipment for which the training was performed, has been financed from other than Tacis funding).
Result
Navigation path
Objective
With this project training on NDT equipment should be given.
The equipment’s origin was Intercontrole, France. (The NDT-equipment for which the training was performed, has been financed from other than Tacis funding).
Result
Background
Project Aims
This project main objective was the improvement of the operational safety of Russian VVER NPPs through the increase of the expertise level of specialists for non-destructive testing.
The specific objectives were:
Background
Objective
Beneficiary Organisation: Goskomatom
1) Background
1) Background
Objective
Procurement of Spare Parts for the Diagnostic Systems in Units 3 and 4.
At the beginning of 1990 VNIIAES has purchased from Siemens diagnostic systems like Acoustic Leakage-Detection, Loose Part Detection (Type SUES, KUES, ALUES) on a large scale.
1) Background
The safety assessment of the plant operational and maintenance practices identified missing data acquisition system that performs data processing, analysis and inspection report writing of the eddy current inspection of the VVER steam generator tubes.