Objective
With this project training on NDT equipment should be given.
The equipment’s origin was Intercontrole, France. (The NDT-equipment for which the training was performed, has been financed from other than Tacis funding).
Result
Navigation path
Objective
With this project training on NDT equipment should be given.
The equipment’s origin was Intercontrole, France. (The NDT-equipment for which the training was performed, has been financed from other than Tacis funding).
Result
Background
Project Description
After the "Stuck-open of the pressurizer safety valve" incident that occurred in Zaporozhye in 1995, the maintenance work was incriminated and led to a modification of the geometry of valve seat and disk.
Objectives
The present TACIS project U1.01/95C aims at replacing the 12 SG (steam generator) safety valves (2 per SG) of each unit 1 and unit 2 of Rovno NPP. The new safety valves should have the following functions:
Project Aims
This project main objective was the improvement of the operational safety of Russian VVER NPPs through the increase of the expertise level of specialists for non-destructive testing.
The specific objectives were:
Beneficiary Organization Details
Dukovany NPP (Czech Republic)
http://www.cez.cz
Project Aims
Objectives
Objective
Since the Soviet Union purchased a number of valves in the West, mainly in Germany, parts for valves urgently to be replaced have been asked for by the Beneficiary to be funded in the framework of TACIS.
Background
Beneficiary organisation: Energoatom, Ukraine
1) Background
South Ukraine NPP needed support for improvement of its maintenance system: maintenance management was not performed according to modern practice.
2) Objectives
Objectives
1) Background
1) Background
Beneficiary organisation: Energoatom, Ukraine
1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 90’, there was an urgent need for spare parts in order to allow their operation.
Objectives
1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 80’s, there was an urgent need for spare parts in order to allow operation of Ukrainian NPPs.
1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 80’s, there was an urgent need for spare parts in order to allow operation of Ukrainian NPPs.
1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 80’s, there was an urgent need for spare parts in order to allow operation of Ukrainian NPPs.
1) Background
The safety assessment of the plant operational and maintenance practices identified missing data acquisition system that performs data processing, analysis and inspection report writing of the eddy current inspection of the VVER steam generator tubes.