Objective
The objective of the project was the design of a facility for removal of unsorted solid wastes, stored at NPP site, from the storage pits, and sorting the wastes for eventual transport to a conditioning unit.
Navigation path
Objective
The objective of the project was the design of a facility for removal of unsorted solid wastes, stored at NPP site, from the storage pits, and sorting the wastes for eventual transport to a conditioning unit.
Only general contract information avail
Objective
Objective
Background
Background
1) Background
Background
Background
Objective
The waste centre (for both NPP and non-NPP radwaste) includes:
Project description
Background
Objective
Background