Objective
The objective of the present project was to perform a limited integrity assessment of the VVER 1000 Reactor Pressure Vessel (RPV) taking into account the irradiation embrittlement effect.
The project covered four major areas:
Navigation path
Objective
The objective of the present project was to perform a limited integrity assessment of the VVER 1000 Reactor Pressure Vessel (RPV) taking into account the irradiation embrittlement effect.
The project covered four major areas:
Background
Background
1)Background
Objectives
Objective
The objective of this project was to assist the GAN-RF and Russian TSOs in reviewing and assessing the accident analysis performed for units 1 and 2 of Kola NPP within project TACIS-91-1.3, further referred to as Industrial Project.
Background
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 94 with the same Western and Eastern Utility and NPPs.
Objectives
The LBB (Leak Before Break) project was a part of the OSA project activities for Medzamor NPP unit 2. The on site utility in Medzamor NPP during the project was Sogin. The Contractor of the LBB/LDS project was Ansaldo Energia in consortium with Empresarios Agrupados and KONEXP (Russia).
Objective
In the existing fuel loading machines Instrumentation and Control errors in fuel positioning occurred and due to malfunction of the electronics all limiting blockings could run out of function.
Objective
Objectives
Project background
Objectives
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 96 with the same Western and Eastern Utilities and NPPs.
Objective
Background
Objective
Project Aims
The work to be performed under this contract was aimed at preparing the co-operation with the Ukrainian NPP Zaporozhe in continuation of a previous Tacis programme implementation.