Background
Search
Contract information field: Programme
Contract information field: Country
- (-) Remove Russia filter Russia (17)
- Ukraine (18) Apply Ukraine filter
- Armenia (4) Apply Armenia filter
- European Union (4) Apply European Union filter
- Kazakhstan (3) Apply Kazakhstan filter
- Belarus (2) Apply Belarus filter
- Kyrgyzstan (1) Apply Kyrgyzstan filter
- Uzbekistan (1) Apply Uzbekistan filter
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- Tecnatom (4) Apply Tecnatom filter
- EDF (Electricite de France) (3) Apply EDF (Electricite de France) filter
- Areva (1) Apply Areva filter
- British Council (1) Apply British Council filter
- CAG TECHNOLOGIE MANAGEMENT CONSULTANTS GREIFSWALD GMBH (1) Apply CAG TECHNOLOGIE MANAGEMENT CONSULTANTS GREIFSWALD GMBH filter
- DESLYS (1) Apply DESLYS filter
- Intercontrole (1) Apply Intercontrole filter
- JRC (Joint Research Centre - European Commission) (1) Apply JRC (Joint Research Centre - European Commission) filter
- Magnox Electric (1) Apply Magnox Electric filter
- National Nuclear Corporation (1) Apply National Nuclear Corporation filter
- STUK (Sateilyturvakeskus) (1) Apply STUK (Sateilyturvakeskus) filter
- THALES (1) Apply THALES filter
Contract information field: Sector
- DS - Design safety (incl. Off-Site Emergency Preparedness) (11) Apply DS - Design safety (incl. Off-Site Emergency Preparedness) filter
- HI - Horizontal Issues (3) Apply HI - Horizontal Issues filter
- DELRU - EC Delegation to Russia (2) Apply DELRU - EC Delegation to Russia filter
- WDS - Waste, Decommissioning and Safeguards (1) Apply WDS - Waste, Decommissioning and Safeguards filter
Contract information field: Types of activities
- (-) Remove Training filter Training (17)
- Equipment Supply (173) Apply Equipment Supply filter
- Design safety (92) Apply Design safety filter
- On Site Assistance (88) Apply On Site Assistance filter
- Technical Support Organisations (37) Apply Technical Support Organisations filter
- Waste Management (34) Apply Waste Management filter
- Studies (29) Apply Studies filter
- Safeguards (18) Apply Safeguards filter
- RBMK studies (13) Apply RBMK studies filter
- Fuel Cycle (9) Apply Fuel Cycle filter
- Technical expertise (7) Apply Technical expertise filter
- Euratom Loan Preparation (6) Apply Euratom Loan Preparation filter
- Emergency Preparedness (5) Apply Emergency Preparedness filter
- Regulatory Authorities (3) Apply Regulatory Authorities filter
- Decommissioning (2) Apply Decommissioning filter
- Mitigation of Chernobyl accident (2) Apply Mitigation of Chernobyl accident filter
- Probabilistic Safety Analysis (2) Apply Probabilistic Safety Analysis filter
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Objective
Objective
Objective
The aim of this project was to enable the Novovoronezh Training Centre (NVVTC) to develop their simulator further in order to provide them with a training facility more adapted to their needs.
Objective
Objective
This contract, signed in September 1997, included two separate projects of the TACIS 1995 programme.
Project R5.01/95: Establishment of the Russian Methodology and Training Centre (RMTC), Phase 3
Background
Objective
Objective
Development of training material for NPP Training Points located at NPP sites for On the Job Training (OJT) with the methodology used to implement the material for the Training Centres (refer to TACIS 1.8 and TACIS 4.1).
More information on the outcome of the project is under preparation.
Background
Background
Objective
The training programme for the management of the NPPs/Nuclear Facilities included:
Background
Objective
With this project Training of NPP Operators at CAG Greifswald full scale simulator was planned.
(2 weeks courses for 6-7 participants were foreseen)
Result
Background
Project Aims
This project main objective was the improvement of the operational safety of Russian VVER NPPs through the increase of the expertise level of specialists for non-destructive testing.
The specific objectives were: