Background
Search
Contract information field: Programme
Contract information field: Country
- (-) Remove Russia filter Russia (89)
- Ukraine (53) Apply Ukraine filter
- Hungary (9) Apply Hungary filter
- Czech Republic (8) Apply Czech Republic filter
- Kazakhstan (6) Apply Kazakhstan filter
- Slovakia (6) Apply Slovakia filter
- Belarus (3) Apply Belarus filter
- European Union (3) Apply European Union filter
- Armenia (2) Apply Armenia filter
- Bulgaria (2) Apply Bulgaria filter
- Lithuania (2) Apply Lithuania filter
- Romania (2) Apply Romania filter
- Estonia (1) Apply Estonia filter
- Kyrgyzstan (1) Apply Kyrgyzstan filter
- Poland (1) Apply Poland filter
- Slovenia (1) Apply Slovenia filter
- Uzbekistan (1) Apply Uzbekistan filter
Contract information field: Budget year
- 2013 (1) Apply 2013 filter
- 2011 (1) Apply 2011 filter
- 2010 (1) Apply 2010 filter
- 2009 (3) Apply 2009 filter
- 2008 (2) Apply 2008 filter
- 2007 (2) Apply 2007 filter
- 2006 (4) Apply 2006 filter
- 2005 (16) Apply 2005 filter
- 2004 (28) Apply 2004 filter
- 2003 (34) Apply 2003 filter
- 2002 (18) Apply 2002 filter
- 2001 (12) Apply 2001 filter
- 2000 (14) Apply 2000 filter
- 1999 (16) Apply 1999 filter
- 1998 (17) Apply 1998 filter
- 1997 (30) Apply 1997 filter
- 1996 (72) Apply 1996 filter
- 1995 (55) Apply 1995 filter
- (-) Remove 1994 filter 1994 (89)
- 1993 (36) Apply 1993 filter
- 1992 (56) Apply 1992 filter
- 1991 (51) Apply 1991 filter
Contract information field: Status
Contract information field: Contractor
- Framatome (4) Apply Framatome filter
- Riskaudit (4) Apply Riskaudit filter
- SEBIM (4) Apply SEBIM filter
- Areva (3) Apply Areva filter
- Belgatom (3) Apply Belgatom filter
- EDF (Electricite de France) (3) Apply EDF (Electricite de France) filter
- EFCC (European Fuel Cycle Consortium) (3) Apply EFCC (European Fuel Cycle Consortium) filter
- MGPI (Mirion Technologies) (3) Apply MGPI (Mirion Technologies) filter
- RRCKI ( Russian Research Centre Kurchatov Institute) (3) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- Siemens (3) Apply Siemens filter
- Balfour Williamson (2) Apply Balfour Williamson filter
- BERRY (2) Apply BERRY filter
- Bosch (2) Apply Bosch filter
- British Energy (2) Apply British Energy filter
- Crown Agents (2) Apply Crown Agents filter
- JRC (Joint Research Centre - European Commission) (2) Apply JRC (Joint Research Centre - European Commission) filter
- Magnox Electric (2) Apply Magnox Electric filter
- Nukem (2) Apply Nukem filter
- VTT (Technical Research Centre of Finland) (2) Apply VTT (Technical Research Centre of Finland) filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- ANTECH (1) Apply ANTECH filter
- Balduf (1) Apply Balduf filter
- Brühl&Kjaer (1) Apply Brühl&Kjaer filter
- Canberra (1) Apply Canberra filter
- CITA (1) Apply CITA filter
- Cotecna (1) Apply Cotecna filter
- DataLoop (1) Apply DataLoop filter
- EFCO (1) Apply EFCO filter
- Elektrogorsk Research and Engineering Center on NPP Safety (1) Apply Elektrogorsk Research and Engineering Center on NPP Safety filter
- Empresarios Agrupados (1) Apply Empresarios Agrupados filter
- Enel (1) Apply Enel filter
- Enprima Engineering Oy (1) Apply Enprima Engineering Oy filter
- EURISYS (1) Apply EURISYS filter
- EWN (Energiewerke Nord) (1) Apply EWN (Energiewerke Nord) filter
- Gea Wenutec (1) Apply Gea Wenutec filter
- IBS (1) Apply IBS filter
- ICL (International Computers Limited) (1) Apply ICL (International Computers Limited) filter
- Industrial Marketing (1) Apply Industrial Marketing filter
- Italtrend (1) Apply Italtrend filter
- KOOPERATIONSSTELLE KERNTECHNIK ENERGIE (1) Apply KOOPERATIONSSTELLE KERNTECHNIK ENERGIE filter
- Lamport (1) Apply Lamport filter
- Mitsui Babcock (1) Apply Mitsui Babcock filter
- NERSA (Centrale Nucleaire Europeenne a Neutrons Rapides) (1) Apply NERSA (Centrale Nucleaire Europeenne a Neutrons Rapides) filter
- Protem (1) Apply Protem filter
- Sartorius (1) Apply Sartorius filter
- Schneider Electric (1) Apply Schneider Electric filter
- SEMPELL AG (1) Apply SEMPELL AG filter
- Seres (1) Apply Seres filter
- SGN (Societe generale pour les techniques nouvelles) (1) Apply SGN (Societe generale pour les techniques nouvelles) filter
- Taprogge (1) Apply Taprogge filter
Contract information field: Sector
- DS - Design safety (incl. Off-Site Emergency Preparedness) (22) Apply DS - Design safety (incl. Off-Site Emergency Preparedness) filter
- WDS - Waste, Decommissioning and Safeguards (13) Apply WDS - Waste, Decommissioning and Safeguards filter
- RA - Regulatory Authorities (5) Apply RA - Regulatory Authorities filter
- HI - Horizontal Issues (4) Apply HI - Horizontal Issues filter
Contract information field: Types of activities
- Equipment Supply (43) Apply Equipment Supply filter
- Design safety (13) Apply Design safety filter
- On Site Assistance (8) Apply On Site Assistance filter
- Fuel Cycle (4) Apply Fuel Cycle filter
- RBMK studies (4) Apply RBMK studies filter
- Technical Support Organisations (4) Apply Technical Support Organisations filter
- Training (4) Apply Training filter
- Studies (2) Apply Studies filter
- Waste Management (2) Apply Waste Management filter
- Safeguards (1) Apply Safeguards filter
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Objective
Background
Objective
Objectives
Kalinin Secondary water chemistry
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Kalinin Make up water preparation (I)
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Kalinin Make up water preparation (II)
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Objective
A general assessment was to be performed on how to improve the medium voltage supply at Kalinin. The assessment should cover medium voltage distribution associated with automation, supervision and cabling.
Deliverables of the assessment:
Background
Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.
Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.
Objective
Objective
Objective
Objective
Objective
Objective
Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Objective
The aim of the project was the replacement of the existing safety valves on the steam generators on one of the 4 Units by modern safety valves. The objective included supply of equipment, related services, spare parts, auxiliary equipment and tools.