Project Aims
The project objective was to issue PSA reports for Novovoronezh NPP, in particular:
Navigation path
Project Aims
The project objective was to issue PSA reports for Novovoronezh NPP, in particular:
R2.01/99 - Phare specific and Kola Units 3&4 specific qualification of Bubble condenser test facility at Elektrogorsk and performance of relevant tests
Objective
Objective
Project Background
Appropriate water chemistry of both primary (nuclear) and secondary (non-nuclear) cooling circuits of a nuclear power plant is necessary to maintain safe, reliable and economical operation of the plant. Among others, it helps to
Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Objective
The objective of the project was to analyse the current leak rate of the confinement for VVER-230 reactors and consequently to propose how to decrease it drastically.
Objective
Objective