Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Navigation path
Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Objective
Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Objective
Objective
A simulator was to be provided for instruction and proficiency training of operator teams to improve their skills and knowledge.
The simulator had to provide the following types of training:
Project Background
Appropriate water chemistry of both primary (nuclear) and secondary (non-nuclear) cooling circuits of a nuclear power plant is necessary to maintain safe, reliable and economical operation of the plant. Among others, it helps to
Objective
Project Aims
Background
Background
R2.01/99 - Phare specific and Kola Units 3&4 specific qualification of Bubble condenser test facility at Elektrogorsk and performance of relevant tests
Objective
Objectives:
Objective
Objective
Application of the LBB Concept on VVER-440/230 Primary Circuit
Objective
Objectives
Objective
With this project a technical basis for the qualification of Non Destructive Examination (NDE) was intended to be established in Russia.
The project activities were divided into three (3) different fields of work: