1) Background
In the framework of the improvement of the performance and the enhancement of the engineering capabilities of the nuclear design Kiev Institute "Energoproject" (KIEP), the EC funded some projects to:
Navigation path
1) Background
In the framework of the improvement of the performance and the enhancement of the engineering capabilities of the nuclear design Kiev Institute "Energoproject" (KIEP), the EC funded some projects to:
Objectives:
Background
Background
1) Background
Beneficiary Organisation: Energoatom/End user SUK NPP
1) Background
The TACIS 96 programme for nuclear safety agreed upon between the European Commission and Ukraine contains provisions for operational safety and near term technical improvements for Ukrainian NPP.
1) Background
1) Background
In the framework of the improvement of the performance and the enhancement of the engineering capabilities of the nuclear design Kiev Institute "Energoproject" (KIEP), the EC funded some projects to:
1) Background
This project represented a continuation of the project U2.02/93C (see the relevant PRS), when the training centre was designed. Its aim was to continue the creation of the regional Training Centre at Zaporozhe NPP for training of maintenance personnel.
1) Background
This project represented a continuation of the project U2.02/93B and was followed by the project 2.02/94C and 2.01/95 (see the relevant PRSs).
1) Background
1) Background
This project is the continuation of the project UK/TS/01 A (see the relevant PRS) dedicated to safety assessment of the NPPs at the Rovno site.
Project Aims
The project aimed to establish English Language training for officials.
A proposed teaching plan was established in the Terms of Reference of the contract:
1) Module I consisting of 4 weeks in Ukraine, divided as:
1) Background
Project Description (to be included in the Database)
The aims of the On-Site Assistance at the RNPP have been:
1. to improve operational safety culture of the RNPP (Soft OSA) through general On-Site Assistance to RNPP eg.
Background
Background
This project was a follow-up of a previous project (UK/TS/TR1) which consisted in the transfer of neutronic codes to the Scientific Technical Center of Ukraine (STC, the Ukrainian Technical Support Organisation).
U1.01/95 - Phase 3
Background