Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.
Navigation path
Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.
Objective
Objective
Objective
Objective
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme” it was decided to deliver training equipment for the personnel of the Aktau NPP (BN-350, fast breeder). The equipment covers the following items:
Objectives
Objectives
Objective
Objective
Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Objective
The aim of the project was the replacement of the existing safety valves on the steam generators on one of the 4 Units by modern safety valves. The objective included supply of equipment, related services, spare parts, auxiliary equipment and tools.
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective
The objective was to replace 430 units of accumulator cells for safety related systems, among them control systems and SCRAM system at Balakovo Nuclear Power Plant.
Result
Objectives
Objectives
Objectives
Background
The Russian Federation decided to transform and reinforce its State System of Accountancy and Control (SSAC) of nuclear materials. The kernel of this improvement was the implementation of modern SSAC approaches based on international experience.