Objective
The key purpose of Project R2.30/94 is to assess the adequacy of the computational codes used in the reference analysis of the following severe accidents:
Navigation path
Objective
The key purpose of Project R2.30/94 is to assess the adequacy of the computational codes used in the reference analysis of the following severe accidents:
Background
Objective
Application of the LBB Concept on VVER-440/230 Primary Circuit
Objective
Project background
Project background
Background
Project Background
Background
Background and Project Aims
Background
Background
A tender evaluation committee was organised to evaluate the tenders for the project U2.04/96. The Evaluation Committee consisted of:
• a Chairman (DG IA), the Task Manager (DG IA) and a secretary (Tacis PU),
Project Background
Background
This second contract was placed to extend the scope of the project U2.05/94 (see 23160 for a description of the first contract).
1) Background
Objective
The wider objective of the project was intended to strengthen the Nuclear Safety through the support of the training system and training facilities at Russian NPP’s.
Objective
With this project Training of NPP Operators at CAG Greifswald full scale simulator was planned.
(2 weeks courses for 6-7 participants were foreseen)
Result
R2.01/99 - Phare specific and Kola Units 3&4 specific qualification of Bubble condenser test facility at Elektrogorsk and performance of relevant tests
Objective
Objectives
Objective