Objective
This present project shall complete the work initiated under R1.03/94E and R1.03/95A.
In the frame of this project, the following tasks are to be performed:
Navigation path
Objective
This present project shall complete the work initiated under R1.03/94E and R1.03/95A.
In the frame of this project, the following tasks are to be performed:
Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Background
Project Background
Appropriate water chemistry of both primary (nuclear) and secondary (non-nuclear) cooling circuits of a nuclear power plant is necessary to maintain safe, reliable and economical operation of the plant. Among others, it helps to
Objectives: