Background
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2013 (1) Apply 2013 filter
- 2012 (1) Apply 2012 filter
- (-) Remove 2011 filter 2011 (17)
- 2010 (13) Apply 2010 filter
- 2009 (19) Apply 2009 filter
- 2008 (20) Apply 2008 filter
- 2007 (12) Apply 2007 filter
- 2006 (10) Apply 2006 filter
- 2005 (4) Apply 2005 filter
- 2004 (10) Apply 2004 filter
- 2003 (12) Apply 2003 filter
- 2002 (8) Apply 2002 filter
- 2001 (2) Apply 2001 filter
- 2000 (4) Apply 2000 filter
- 1999 (2) Apply 1999 filter
- (-) Remove 1998 filter 1998 (17)
- (-) Remove 1997 filter 1997 (17)
- 1996 (29) Apply 1996 filter
- 1995 (16) Apply 1995 filter
- 1994 (27) Apply 1994 filter
- 1993 (19) Apply 1993 filter
- 1992 (6) Apply 1992 filter
- 1991 (26) Apply 1991 filter
Contract information field: Status
Contract information field: Contractor
- EDF (Electricite de France) (3) Apply EDF (Electricite de France) filter
- EUROPEAN NUCLEAR SAFETY TRAINING AND TUTORING INSTITUTE GEIE (2) Apply EUROPEAN NUCLEAR SAFETY TRAINING AND TUTORING INSTITUTE GEIE filter
- Italtrend (2) Apply Italtrend filter
- Belgatom (1) Apply Belgatom filter
- ENCO - Enconet (1) Apply ENCO - Enconet filter
- LINKLATERS (1) Apply LINKLATERS filter
- Riskaudit (1) Apply Riskaudit filter
- SCK CEN (Centre d'Etude de l'Energie Nucleaire) (1) Apply SCK CEN (Centre d'Etude de l'Energie Nucleaire) filter
- SGN (Societe generale pour les techniques nouvelles) (1) Apply SGN (Societe generale pour les techniques nouvelles) filter
- STUK (Sateilyturvakeskus) (1) Apply STUK (Sateilyturvakeskus) filter
- Suez Tractebel (1) Apply Suez Tractebel filter
- Wismut (1) Apply Wismut filter
Contract information field: Sector
- DS - Design safety (incl. Off-Site Emergency Preparedness) (5) Apply DS - Design safety (incl. Off-Site Emergency Preparedness) filter
- RA - Regulatory Authorities (4) Apply RA - Regulatory Authorities filter
- HI - Horizontal Issues (2) Apply HI - Horizontal Issues filter
- WDS - Waste, Decommissioning and Safeguards (2) Apply WDS - Waste, Decommissioning and Safeguards filter
- OSA - On Site Assistance (1) Apply OSA - On Site Assistance filter
Contract information field: Types of activities
- Design safety (5) Apply Design safety filter
- Regulatory Authorities (4) Apply Regulatory Authorities filter
- Equipment Supply (2) Apply Equipment Supply filter
- Fuel Cycle (2) Apply Fuel Cycle filter
- On Site Assistance (2) Apply On Site Assistance filter
- Euratom Loan Preparation (1) Apply Euratom Loan Preparation filter
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
- (-) Remove Restricted Call for Tender filter Restricted Call for Tender (14)
- (-) Remove Negotiated Procedure filter Negotiated Procedure (3)
- Direct Agreement (50) Apply Direct Agreement filter
- Service contracts - International Restricted Procedure with prior publication (9) Apply Service contracts - International Restricted Procedure with prior publication filter
- Service contracts - Exceptional Negotiated Procedure with a single offer (4) Apply Service contracts - Exceptional Negotiated Procedure with a single offer filter
- Informal Consultation (2) Apply Informal Consultation filter
- Open Call for Tender (1) Apply Open Call for Tender filter
- Specific contract on Framework contract (1) Apply Specific contract on Framework contract filter
Cooperation with SNRIU in independent radiation monitoring of territories with medical institutions using radiation & nuclear technologies, and around uranium mining and milling facilities
Background
The purposes of this contract are as follows:
The specific objective of component A is to strengthen the SNRIU capabilities in regulatory activity related to safety improvements conducted at all operating Ukrainian NPPs, including seismic analysis.
1.Objectives
Following the Fukushima Daiichi accident, the EU nuclear power plants had to undergo a comprehensive and transparent assessment of their safety and risks ("EU Stress Tests"). Subsequently the EU opened this assessment for voluntary participation of neighbouring countries.
OBJECTIVES:
OBJECTIVES:
Introduction
Project summary will be published after the completion of the project.
1) Background
The goal of this TACIS project U2.01/97 is to improve the operational safety of the Ukrainian Nuclear Power Plants, through increasing the quality of Non Destructive Testing performed for In Service Inspection.
2) Objectives
Background
Objective
The overall objective was to provide support to Minatom for remediation of the uranium mines in Lermontov, Stavropol Region.
In order to achieve the above objective, the work will have to cover the following items:
Background
Background
Objective
Background
Objective
The original design of WWER reactors did not include a diagnostic system in order to monitor the potential danger to the integrity of reactor coolant system (RCS) and to provide an early warning of RCS pressure boundary developing defects.
Part A. Development of Accident management procedures on the test facility PSB-VVER-1000 at Electrogorsk
Objective