Full title of the project
Services required for detailed design studies aiming at defining the optimal solution for the qualification of the LBB concept of the primary circuit including the surge line at the Unit 2 of ANPP.
Navigation path
Full title of the project
Services required for detailed design studies aiming at defining the optimal solution for the qualification of the LBB concept of the primary circuit including the surge line at the Unit 2 of ANPP.
The purpose of this contract is to:
Introduction
Objective
This project aimed at replacing the obsolete radiological Instrumentation and increase capability of the plant radiation monitoring system.
Result
The objective of this contract is to transfer experience of EU countries to the SNRCU and its TSO through support with:
Full Project Title:
Services required for detailed design studies aiming at defining the optimal solution for the qualification of the LBB (Leak Before Break) concept of the primary circuit including the surge line at the Unit 2 of ANPP.