Background
This project was implemented through three separate contracts:
Navigation path
Background
This project was implemented through three separate contracts:
1) Background
This project dealt with TACIS OSA (On-Site Assistance) at Khmelnitsky NPP.
Objectives
Background
The purpose of this contract is to:
Objectives:
Background
Introduction
Objective
This project aimed at replacing the obsolete radiological Instrumentation and increase capability of the plant radiation monitoring system.
Result
Background
Background
The aim of the On-Site Assistance at the ZNPP is to transfer an operational safety culture and to support the implementation of nuclear safety improvement projects.
1) Background
The present project is a continuation of on-site-assistance (OSA), rendered by RWE Energy as the EC appointed Consultant to Zaporoshe NPP.
2) Objectives
This project had 2 main different categories of objectives and tasks:
The objective of this contract is to transfer experience of EU countries to the SNRCU and its TSO through support with:
Full Project Title:
Services required for detailed design studies aiming at defining the optimal solution for the qualification of the LBB (Leak Before Break) concept of the primary circuit including the surge line at the Unit 2 of ANPP.