Objective
Search
Contract information field: Programme
Contract information field: Country
- (-) Remove Russia filter Russia (83)
- (-) Remove Bulgaria filter Bulgaria (1)
- (-) Remove Czech Republic filter Czech Republic (1)
- Ukraine (32) Apply Ukraine filter
- Belarus (4) Apply Belarus filter
- Lithuania (1) Apply Lithuania filter
Contract information field: Budget year
- 2006 (2) Apply 2006 filter
- 2005 (3) Apply 2005 filter
- 2003 (6) Apply 2003 filter
- 2002 (4) Apply 2002 filter
- 2000 (1) Apply 2000 filter
- 1999 (2) Apply 1999 filter
- 1997 (3) Apply 1997 filter
- 1996 (10) Apply 1996 filter
- 1995 (7) Apply 1995 filter
- 1994 (10) Apply 1994 filter
- 1993 (8) Apply 1993 filter
- 1992 (5) Apply 1992 filter
- 1991 (22) Apply 1991 filter
Contract information field: Status
Contract information field: Contractor
- Areva (18) Apply Areva filter
- Belgatom (8) Apply Belgatom filter
- EDF (Electricite de France) (7) Apply EDF (Electricite de France) filter
- Magnox Electric (3) Apply Magnox Electric filter
- Siemens (3) Apply Siemens filter
- Tecnatom (3) Apply Tecnatom filter
- Ansaldo Energia (2) Apply Ansaldo Energia filter
- ATOS ORIGIN BELGIUM SA (2) Apply ATOS ORIGIN BELGIUM SA filter
- BERRY (2) Apply BERRY filter
- Empresarios Agrupados (2) Apply Empresarios Agrupados filter
- Enel (2) Apply Enel filter
- Enprima Engineering Oy (2) Apply Enprima Engineering Oy filter
- Gidropress (2) Apply Gidropress filter
- Iberdrola (2) Apply Iberdrola filter
- TES (2) Apply TES filter
- ABB (Asea Brown Boveri) (1) Apply ABB (Asea Brown Boveri) filter
- Ansaldo STS (1) Apply Ansaldo STS filter
- BIS (Baltijos Informacines Sistemos) (1) Apply BIS (Baltijos Informacines Sistemos) filter
- Elektrogorsk Research and Engineering Center on NPP Safety (1) Apply Elektrogorsk Research and Engineering Center on NPP Safety filter
- ENAC (European Nuclear Assistance Consortium) (1) Apply ENAC (European Nuclear Assistance Consortium) filter
- Esterline (1) Apply Esterline filter
- EWN (Energiewerke Nord) (1) Apply EWN (Energiewerke Nord) filter
- FM Consultants Associates (1) Apply FM Consultants Associates filter
- Framatome (1) Apply Framatome filter
- FSUE (State Scientific Centre of the Russian Federation) (1) Apply FSUE (State Scientific Centre of the Russian Federation) filter
- Gea Wenutec (1) Apply Gea Wenutec filter
- GRS (Gesellschaft fur Anlagen und Reaktorsicherheit) (1) Apply GRS (Gesellschaft fur Anlagen und Reaktorsicherheit) filter
- Intercontrole (1) Apply Intercontrole filter
- JRC (Joint Research Centre - European Commission) (1) Apply JRC (Joint Research Centre - European Commission) filter
- NAS (The National Academy of Sciences of Ukraine) (1) Apply NAS (The National Academy of Sciences of Ukraine) filter
- National Nuclear Corporation (1) Apply National Nuclear Corporation filter
- Nukem (1) Apply Nukem filter
- Resources And Logistics Sarl (1) Apply Resources And Logistics Sarl filter
- RPII (Radiological Protection Institute of Ireland) (1) Apply RPII (Radiological Protection Institute of Ireland) filter
- RRCKI ( Russian Research Centre Kurchatov Institute) (1) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- UJV Rez (Nuclear Research Institute Rez) (1) Apply UJV Rez (Nuclear Research Institute Rez) filter
- VTT (Technical Research Centre of Finland) (1) Apply VTT (Technical Research Centre of Finland) filter
Contract information field: Sector
Contract information field: Types of activities
- (-) Remove Design safety filter Design safety (83)
- On Site Assistance (74) Apply On Site Assistance filter
- Technical Support Organisations (37) Apply Technical Support Organisations filter
- Studies (29) Apply Studies filter
- Waste Management (28) Apply Waste Management filter
- Training (16) Apply Training filter
- Equipment Supply (13) Apply Equipment Supply filter
- RBMK studies (13) Apply RBMK studies filter
- Safeguards (10) Apply Safeguards filter
- Fuel Cycle (9) Apply Fuel Cycle filter
- Technical expertise (7) Apply Technical expertise filter
- Euratom Loan Preparation (6) Apply Euratom Loan Preparation filter
- Emergency Preparedness (3) Apply Emergency Preparedness filter
- Regulatory Authorities (3) Apply Regulatory Authorities filter
- Probabilistic Safety Analysis (2) Apply Probabilistic Safety Analysis filter
- Mitigation of Chernobyl accident (1) Apply Mitigation of Chernobyl accident filter
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
- Restricted Call for Tender (59) Apply Restricted Call for Tender filter
- Direct Agreement (16) Apply Direct Agreement filter
- Negotiated Procedure (4) Apply Negotiated Procedure filter
- Open Call for Proposals (2) Apply Open Call for Proposals filter
- Open Call for Tender (1) Apply Open Call for Tender filter
- Specific contract on Framework contract (1) Apply Specific contract on Framework contract filter
Objective
The objective of the project was to develop a complete and coherent Quality Assurance (QA) Program for operation of Russian NPPs in order to improve as quickly as possible the operating safety of these plants.
Result (General)
Kola 1&2 - Novovoronezh 3&4
REPORTS
1 Progress Report 1st Quarterly Report 25/02/1994
2 Progress Report 2nd Quarterly Report 25/05/1994
3 Progress Report 3rd Quarterly Report 6/10/1994
4 Progress Report 4th Quarterly Report 13/01/1995
Objective
Objective
This project is the continuation of the Tacis 1991 project 3.8 for performing additional Severe Accident (SA) analysis of VVER 1000 scenarios with available SA codes, especially for supporting Tacis 1991 project 3.1.
Project Background
Appropriate water chemistry of both primary (nuclear) and secondary (non-nuclear) cooling circuits of a nuclear power plant is necessary to maintain safe, reliable and economical operation of the plant. Among others, it helps to
Objective
Project Background
Background
Background
This project was implemented through three separate contracts:
Background
This project was implemented through three separate contracts:
Background
This project was implemented through three separate contracts:
Objectives
The present project was implemented through two contracts, one with�a�Consortium of EU�organisations: Framatome ANP, Forschungszentrum Rossendorf (FZR) & University of Pisa (contract 61936; project R2.02/02A); and the other with the Russian nuclear design and engineering organisation, EDO Gid
Objectives
The present project was implemented through two contracts, one with a Consortium of EU organisations: Framatome ANP, Forschungszentrum Rossendorf (FZR) & University of Pisa (contract 61936; project R2.02/02A); and the other with the Russian nuclear design and engineering organisation, EDO Gid
Project Background
Project Background
Background
One of the most important tasks of safety enhancement of the Russian Nuclear Power Plants (NPP) is the analysis and modernization of the VVER-440 safety systems.
Background