Objective R1.02/93
This “On-Site-Assistance”, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases, the OSA was performed by an EU utility, working with a team of Western and Russian experts.
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- RRCKI ( Russian Research Centre Kurchatov Institute) (7) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- SOGIN (Societa Gestione Impianti Nucleari) (4) Apply SOGIN (Societa Gestione Impianti Nucleari) filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- RE (Rheinisch-Westfälisches Elektrizitätswerk) (1) Apply RE (Rheinisch-Westfälisches Elektrizitätswerk) filter
- UJV Rez (Nuclear Research Institute Rez) (1) Apply UJV Rez (Nuclear Research Institute Rez) filter
- VT Nuclear Services (1) Apply VT Nuclear Services filter
Contract information field: Types of activities
- (-) Remove On Site Assistance filter On Site Assistance (15)
- Studies (4) Apply Studies filter
- Technical Support Organisations (4) Apply Technical Support Organisations filter
- Design safety (1) Apply Design safety filter
- Regulatory Authorities (1) Apply Regulatory Authorities filter
- Training (1) Apply Training filter
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Balakovo filter Balakovo (9)
- (-) Remove Medzamor filter Medzamor (6)
- Smolensk (13) Apply Smolensk filter
- Rovno (12) Apply Rovno filter
- South Ukraine (11) Apply South Ukraine filter
- Zaporozhye (10) Apply Zaporozhye filter
- Beloyarsk (9) Apply Beloyarsk filter
- Kalinin (9) Apply Kalinin filter
- Leningrad (Sosnovy Bor) (9) Apply Leningrad (Sosnovy Bor) filter
- Novovoronezh (8) Apply Novovoronezh filter
- Khmelnitsky (7) Apply Khmelnitsky filter
- Kola (6) Apply Kola filter
- Aktau (4) Apply Aktau filter
- Chernobyl (2) Apply Chernobyl filter
- Bilibino (1) Apply Bilibino filter
Contract information field: Nature
- (-) Remove Services filter Services (15)
- Supply (1) Apply Supply filter
Full title of the project
Services required for detailed design studies aiming at defining the optimal solution for the qualification of the LBB concept of the primary circuit including the surge line at the Unit 2 of ANPP.
Background
Due to a backlog of several Tacis equipment supply projects for Balakovo NPP, caused by external factors, there was an urgent need to make provisions for the proper follow-up of these projects.
Objective
The project summary will be published after the completion of the project.
Objective
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 96 with the same Western and Eastern Utilities and NPPs.
Objective
Objective
In the existing fuel loading machines Instrumentation and Control errors in fuel positioning occurred and due to malfunction of the electronics all limiting blockings could run out of function.
Introduction
Objective
Objective
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 94 with the same Western and Eastern Utility and NPPs.
Background
Background