1) Background
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2010 (1) Apply 2010 filter
- 2008 (1) Apply 2008 filter
- 2007 (8) Apply 2007 filter
- 2006 (4) Apply 2006 filter
- 2005 (1) Apply 2005 filter
- 2004 (2) Apply 2004 filter
- 2003 (3) Apply 2003 filter
- 2002 (7) Apply 2002 filter
- 2001 (2) Apply 2001 filter
- 1999 (2) Apply 1999 filter
- 1998 (5) Apply 1998 filter
- 1997 (16) Apply 1997 filter
- 1996 (16) Apply 1996 filter
- (-) Remove 1995 filter 1995 (16)
- 1994 (16) Apply 1994 filter
- 1993 (13) Apply 1993 filter
- 1992 (9) Apply 1992 filter
Contract information field: Status
Contract information field: Contractor
- VHB Germany (3) Apply VHB Germany filter
- Alstom (2) Apply Alstom filter
- SEMPELL AG (2) Apply SEMPELL AG filter
- Bopp & Reuther (1) Apply Bopp & Reuther filter
- Carl Zeiss (1) Apply Carl Zeiss filter
- Deutsche Exide StanBy (1) Apply Deutsche Exide StanBy filter
- IAEA (International Atomic Energy Agency) (1) Apply IAEA (International Atomic Energy Agency) filter
- IBL (1) Apply IBL filter
- Initec Energia (1) Apply Initec Energia filter
- INKLA (1) Apply INKLA filter
- Lloyd Instruments (1) Apply Lloyd Instruments filter
- Roeii Amsier (1) Apply Roeii Amsier filter
- svt Brandschutz (1) Apply svt Brandschutz filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Zaporozhye filter Zaporozhye (9)
- (-) Remove Aktau filter Aktau (6)
- (-) Remove IRT-2000 research reactor filter IRT-2000 research reactor (1)
- (-) Remove Khmelnitsky filter Khmelnitsky (0)
- South Ukraine (17) Apply South Ukraine filter
- Dukovany (13) Apply Dukovany filter
- Bohunice (8) Apply Bohunice filter
- Balakovo (7) Apply Balakovo filter
- Paks (7) Apply Paks filter
- Kalinin (6) Apply Kalinin filter
- Leningrad (Sosnovy Bor) (5) Apply Leningrad (Sosnovy Bor) filter
- Beloyarsk (4) Apply Beloyarsk filter
- Kozloduy (4) Apply Kozloduy filter
- Smolensk (4) Apply Smolensk filter
- Mochovce (3) Apply Mochovce filter
- Rovno (3) Apply Rovno filter
- Žirovski Vrh former uranium mine site (1) Apply Žirovski Vrh former uranium mine site filter
- Bilibino (1) Apply Bilibino filter
- Kola (1) Apply Kola filter
- Krsko (1) Apply Krsko filter
- Loviisa (1) Apply Loviisa filter
- Pűspőkszilágy Radioactive Waste Facility (1) Apply Pűspőkszilágy Radioactive Waste Facility filter
- Salaspils Research Reactor (1) Apply Salaspils Research Reactor filter
- Temelin (1) Apply Temelin filter
Contract information field: Nature
Contract information field: Method of procurement
Objectives
Objectives
Objectives
Objectives
Objectives
Background
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme”, it was decided to improve the passive fire protection facilities of the BN-350 NPP (fast breeder) in Aktau, Kazakhstan. The project was divided into three lots:
Beneficiary Organisation details
Nuclear Regulatory Agency (Bulgaria)
http://www.bnsa.bas.bg
Project Aims
Project Description
After the "Stuck-open of the pressurizer safety valve" incident that occurred in Zaporozhye in 1995, the maintenance work was incriminated and led to a modification of the geometry of valve seat and disk.
Project Description
After the "Stuck-open of the pressurizer safety valve" incident that occurred in Zaporozhye in 1995, the maintenance work was incriminated and led to a modification of the geometry of valve seat and disk.