Objective
A simulator was to be provided for instruction and proficiency training of operator teams to improve their skills and knowledge.
The simulator had to provide the following types of training:
Navigation path
Objective
A simulator was to be provided for instruction and proficiency training of operator teams to improve their skills and knowledge.
The simulator had to provide the following types of training:
Objective
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme” it was decided to deliver training equipment for the personnel of the Aktau NPP (BN-350, fast breeder). The equipment covers the following items:
Objectives
Objectives
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme”, it was decided to improve the passive fire protection facilities of the BN-350 NPP (fast breeder) in Aktau, Kazakhstan. The project was divided into three lots:
Objective
The aim of the project is the refurbishment of the present Process Monitoring System (PMS) with full consideration of the possibility to operate with PMS functions in the present as well as in the new system.
Background
Objective
Objective
The objective of the project is to equip the BN 600 NPP with hardware, software and procedures for thermal visual inspection of the high voltage equipment for timely prevention of the accidents at the BN 600 NPP.
Beloyarsk Process Monitoring System (see projects R1.06/95E and R1.06/96B)
Objective
Objective
Objectives